An administrator successfully finished restoring a SDDC Manager and now needs to verify its operation. Which tool should the administrator use for this verification?
The vSAN Witness appliance for a VMware Cloud Foundation stretched vSAN cluster stopped working. The administrator needs to roll out a new appliance to replace the old one.
Which tool should the administrator use to perform this task?
A vSphere administrator is tasked with enabling Workload Management on a VMware Cloud Foundation Workload Domain.
Which three components are configured as part of the Supervisor Cluster control plane after this task is completed? (Choose
three.)
What limits can an administrator configure on a vSphere Namespace for a VMware Cloud Foundation Developer-Ready Workload Domain?
VCF design workshops were conducted, and the architect collected the following customer requirements for the newly planned VCF infrastructure:
• The new VCF infrastructure must target two zones: DEV/UAT and DMZ.
• The security team would like to have full management and network isolation between these two zones
• 12 hosts have been ordered for the solution.
• DEV/UAT workloads must comply with an erasure coding vSAN storage policy with the ability to tolerate the failure of two hosts.
Which workload domain sizing will be required to achieve these requirements?
A VCF administrator is preparing to configure scheduled backups for the SDDC Manager. What must the administrator register as an external component to complete this task?
An architect is designing overlay networking and routing for two VMware Cloud Foundation VI workload domains The following requirements must be met in the design:
• NSX-T Bare Metal Edge nodes are required to satisfy a requirement for extremely low latency.
• The costs must be kept to a minimum.
Which design meets these customer requirements?
Which three options are valid use cases for multiple clusters in a workload domain? (Choose three.)
An administrator is tasked with enabling workload management for a VMware Cloud Foundation Management Workload Domain. This set of requirements was collected during the design workshops:
• Developers should be able to utilize vSphere Pods feature.
• Embedded harbor registry feature should be supported.
• Developers need to utilize persistent volumes across multiple provisioned vSphere Pods.
Which three actions will meet the requirements for this deployment? (Choose three.)
Which order of steps should an administrator use to replace a failed host in a stretched cluster?