What kind of changes can be made to test sets linked from Orchestrator in Test Manager?
A developer, who has just discovered Test Suite, built a test case that checks if the SumWorkflow correctly performs the sum of 2 integers, using different input values from an Excel file.
The test case was published to Orchestrator. How many Test Runs will be generated when the test case is executed?
SumWorkflow:
TestCase:
TestData.xlsx:
Consider the following testing setup in Orchestrator:
Orchestrator folder "FolderA" which contains test data queue "TestData"
Orchestrator folder "FolderB" which contains test data queue "TestData"
Data-driven test case "TestCase123" linked with "TestData" queue from Orchestrator folder "FolderA"
"TestCase123" is published to Orchestrator and executed from "FolderB". What will be the result?
What are the key features of UiPath Test Manager and its integration with ALM solutions, facilitated by UiPath Test Manager Connect?
What happens once a Test Set execution starts in Test Manager?
What are the two methods for executing tests and where are they invoked??
How can the activities covered during a test case execution in UiPath Studio be checked?
When creating a new test set in UiPath Orchestrator, what is the purpose of using a wildcard symbol (*) for the project version?
One requirement of the organization's testing strategy is to attach a screenshot to a test case execution whenever it fails. How can this be achieved?
Where can the variations that have passed or failed for a data-driven test case in UiPath Studio be viewed?
What are the tasks that can be executed from the UiPath command-line interface (CLI) while creating a CI/CD pipeline?
Which activity enables retrieving random data from a defined set of test data?
When should a Test Data File in data-driven testing be used?
What are the steps to re-execute a test case from UiPath Orchestrator?
What does the UiPath CLI allow to do?
What are the actions needed in UiPath Test Manager in order to give the Project Owner role to a different user?
How can the test data queue items be uploaded to a queue?
What is the appropriate scenario to use the "Synchronize mock" action?
What does the Total Coverage KPI from the UiPath Test Manager Dashboard measure?
What is a limitation when re-executing test case executions for data-driven test cases?
What type(s) of license should be used in order to be able to connect Studio to Test Manager?
What factors influence the calculation of coverage in the Descriptor Coverage feature in UiPath?
DRAG DROP
What is the sequence of execution of the main blocks of a Test Case that has Test Automation Framework attached?
Instructions: Drag the Description found on the left and drop on the correct Sequence of Execution found on the right.
What is the purpose of UiPath Test Manager Hub?
What type of data can be added to the Tester Comment field?
What color code in the status tab represents a test without a definitive results or that have not been executed yet but is a part of a test set that is currently being executed?
Who can import projects in Test Manager?
What are the available actions that can be taken to manage test sets in UiPath Orchestrator?
What type of license is used for an Unattended Robot in development and testing mode, enabling it to execute both test cases and RPA processes?
What happens if a Test Execution is re-executed?
What is the maximum number of Projects that can be created in Test Manager?
What is application testing in the context of UiPath?
There is a test case that performs multiple verifications.
How can the test case be configured so that the execution stops when a verification fails?