Question 1

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Question 2

In the calculations for Water Efficiency Prerequisite, Indoor Water Use Reduction, private use refers to lavatory faucets used by which of the following types of occupants?

Options:

A.

Prisoners, hospital inpatients, hotel staff

B.

Apartment residents, motel guests, nursing home residents

C.

Students, hospital staff, hotel guests

D.

Dorm residents, fire-station staff, nursing home staff

Question 3

What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?

Options:

A.

Botulism

B.

Mold growth

C.

Iron poisoning

D.

Legionella outbreak

Question 4

Which of the following is a feature of the ENERGY STAR® Portfolio Manager?

Options:

A.

Requires input of 36 months of data

B.

Requires ISO 14001 compliance

C.

Requires calculation and input of site energy usage

D.

Requires California Title 24 compliance

Question 5

The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit,

Light Pollution Reduction. Which interpretations must be used when attempting this credit?

Options:

A.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published after the project's registration date that the project thinks is relevant

B.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published on the project's

registration date that the project thinks is relevant

C.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published before the project's

registration date that applies to the project's rating system

D.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published before the

project's registration date that applies to the project's rating system

Question 6

For an office building with few visitors, which of the following actions must the project team do in order to comply with Location and Transportation Credit, Alternative Transportation?

Options:

A.

Encourage telecommuting and the use of mass transit

B.

Survey visitors to determine their transportation modes

C.

Survey the occupants to determine their transportation modes

D.

Provide parking for low-emitting vehicles for 5% of the building occupants

Question 7

Which of the following strategies will qualify for an exemplary performance point under Innovation Credit, Innovation, Option 3. Additional Strategies?

Options:

A.

Meet at least 10% of total energy with on-site renewable energy

B.

Reduce outdoor water use by 60%

C.

Document an alternative transport

D.

Obtain a response rate for the occupant comfort survey of 100%

Question 8

Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.

A product labeled Sustainable Sourced

B.

An organic product produced within a 500 mi. (805 km) radius

C.

A United States Department of Agriculture (USDA) organic food product

D.

A Protected Harvest certified product purchased outside the performance period

Question 9

An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?

Options:

A.

120 days

B.

495 days

C.

Two years

D.

Three years

Question 10

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

Options:

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

Question 11

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Question 12

When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?

Options:

A.

10%

B.

20%

C.

30%

D.

40%

Question 13

Cooling tower blowdown is necessary because

Options:

A.

too much water in the system is inefficient so its water levels must be lowered

B.

a buildup of dissolved solids increases conductivity which decreases efficiency

C.

excess water treatment chemical levels corrode pipes and bleed-off reduces chemical levels

D.

cold temperatures can freeze pipes if water is not moved and bleed-off prevents that from happening

Question 14

What type of Credential does the principal participant of a project need to earn in order to achieve one point in the innovation credit?

Options:

A.

LEED Fellow

B.

LEED Green Rater

C.

LEED Green Associate

D.

LEED Accredited Professional (AP) with a specialty appropriate for the project

Question 15

The maximum number of points in the Innovation Category that can be achieved by exemplary performance is

Options:

A.

one point

B.

two points

C.

three points

D.

four points

Question 16

A cafeteria purchases $325.00 USD worth of United States Department of Agriculture (USDA) Organic Certified produce from a farm located 50 mi. (80 km) from the project building during the performance period. What is the maximum allowable value for this purchase that can be claimed towards Materials and Resources Credit, Purchasing- Ongoing?

Options:

A.

$0.00 USD

B.

$162.50 USD

C.

$325.00 USD

D.

$650.00 USD

Question 17

Which of the following options about project boundaries is correct?

Options:

A.

The LEED project boundary may not include other buildings

B.

A LEED campus boundary for the master site is not necessary to pursue with LEED campus certification

C.

The gross floor area of the LEED project should be no less than 2% of the gross land area within the LEED project boundary

D.

Sites with a master plan for multiple buildings and/or phased development must not designate a LEED project boundary for each individual project

Question 18

Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement

Plan?

Options:

A.

Soils

B.

Hydrology

C.

Vegetation

D.

Maintenance equipment

Question 19

A building manager benchmarks a building's energy performance in ENERGY STAR® Portfolio Manager for the purposes of Energy and Atmosphere Prerequisite, Minimum Energy Performance. The use of the energy use intensity (EUI) tool in Portfolio Manager also satisfies which of the following steps performed under Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?

Options:

A.

Examine average and peak utility costs

B.

Develop a sequence of operations for building systems

C.

Create an energy use breakdown by major system types or end uses

D.

Establish target energy and cost reduction goals as part of the ASHRAE energy use analysis

Question 20

An individual tenant in a multi-tenant building is unwilling or unable to provide their purchasing data. How does this affect the overall requirement for Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.

The building is not eligible for this credit

B.

The total purchases would be decreased by the tenant's pro rata square footage

C.

The tenant's purchasing is assumed to be 50% compliant toward the sustainability criteria

D.

If the tenant's space is less than 10% of the total building, their total purchases can be excluded

Question 21

Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

Air temperature and humidity

B.

Air speed and radiant temperature

C.

Air temperature and energy consumption

D.

Radiant temperature and energy consumption

Question 22

At a minimum, how often should a survey of building occupants be conducted about transportation patterns according to the Location and Transportation Credit, Alternative Transportation, Option 1?

Options:

A.

Five years

B.

10 years

C.

20 years

D.

15 years

Question 23

For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is

Options:

A.

80 picograms per lumen hour for 90% of lamps

B.

90 picograms per lumen hour for 90% of lamps

C.

70 picograms per lumen hour for all mercury-containing lamps

D.

80 picograms per lumen hour for all mercury-containing lamps

Question 24

When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?

Options:

A.

Distribute the total number of surveys across all tenants evenly

B.

Distribute the total number of surveys across all tenants proportionately, according to their populations

C.

Distribute the total number of surveys across all tenants proportionately, according to their gross floor area

D.

Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Question 25

A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they

Options:

A.

are rapidly renewable

B.

have no mercury content

C.

are adaptable to all existing fixtures have lower up front costs than fluorescent lamps

Question 26

Which of the following is an allowable method to increase cooling tower cycles of concentration?

Options:

A.

Reduce confing tower run-hours

B.

Increase quantities of potable makeup water

C.

Increase treatment levels of potable makeup water

D.

Decrease intervals between cooling tower water testing

Question 27

An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?

Options:

A.

Energy and Atmosphere Prerequisite, Building-Level Energy Metering

B.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices

Question 28

A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

Options:

A.

The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system

B.

The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system

C.

The SRI of the vegetated roof system, and the SRI of the colored concrete

D.

The SRI of the colored concrete, and the SRI of the open-grid pavement system

Question 29

A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection

Guidance, which rating system would be most applicable for this project?

Options:

A.

LEED Interior Design and Construction: Retail

B.

LEED Operations and Maintenance: Retail

C.

LEED Building Design and Construction: Data Centers

D.

LEED Interior Design and Construction: Commercial Interiors

Question 30

In which of the following ways can a campus project using a Group Approach comply with Water Efficiency

Prerequisite, Building-Level Water Metering?

Options:

A.

Meter water use for each building separately; meter outdoor water use for the associated grounds

B.

Meter water use for the entire campus (buildings and the associated grounds) using a single meter

C.

Meter water use for all buildings aggregately with a single meter; outdoor water use for the associated grounds

does not need to be metered

D.

Meter water use for all buildings aggregately with a single meter; meter outdoor water use for the associated

grounds

Question 31

How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water

Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?

Options:

A.

Six months

B.

12 months

C.

18 months

D.

This type of fixture should not be metered

Question 32

Instituting a policy to prevent erosion and sedimentation and restore any eroding soils is a requirement of which credit or prerequisite?

Options:

A.

Water Efficiency Prerequiste, Outdoor Water Use Reduction

B.

Sustainable Sites Credit, Rainwater Management

C.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

D.

Sustainable Sites Credit, Site Management

Question 33

Which of the following transportation modes can be included as an alternative commuting methodin the calculation for Location and Transportation Credit, Alternative Transportation?

Options:

A.

Trips avoided while on vacation

B.

Trips avoided while on business travel

C.

Trips avoided because of telecommuting

D.

Trips avoided by commuting on a motorcycle

Question 34

A management method that could be included in a project's site management policy is the use of

Options:

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Question 35

Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?

Options:

A.

Food

B.

Batteries and lamps

C.

Electric powered equipment

D.

Office equipment, appliances and audiovisual equipment

Question 36

Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?

Options:

A.

Soil Testing

B.

Irrigation monitoring

C.

Fertilizer application

D.

Records of deicer use (if applicable)

Question 37

A project is ineligible for an ENERGY STAR® Rating and will document Energy and Atmosphere Prerequisite,

Minimum Energy Performance by benchmarking against historical data. If the performance period calendar year is

2022, which of the following is an acceptable historical baseline?

Options:

A.

Average of calendar years 2020 and 2021

B.

Average of calendar years 2015, 2016 and 2017

C.

Average of calendar years 2017, 2019 and 2021

D.

Average of calendar years 2017, 2018 and 2019

Question 38

The compliant value of green cleaning products and materials is calculated using what factor?

Options:

A.

Cost

B.

Weight

C.

Volume

D.

Recycled content

Question 39

What is the required frequency for conducting a waste stream audit in maintaining a high-performing solid waste management program?

Options:

A.

Annually

B.

Twice a year

C.

At least once every five years

D.

At least once every three years

Question 40

The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?

Options:

A.

Table of lighting controls installed

B.

Manufacturers' data for occupancy sensors

C.

The total area of the building square footage

D.

A photometric chart of the multi-occupant space

Question 41

Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?

Options:

A.

Retain a LEED AP

B.

Perform a full life-cycle assessment

C.

Bring the project team together in the performance phase

D.

Take an integrative approach

Question 42

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

Options:

A.

Install a vegetated roof system

B.

Convert lawn areas to native plants

C.

Mitigate the vegetated area off-site through a land trust

D.

Convert the paved areas of the site to pervious pavement

Question 43

What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?

Options:

A.

To achieve a daylight factor in all spaces

B.

To provide lighting controls for regularly occupied spaces

C.

To achieve direct line of site to vision glazing for all building occupants

D.

To provide a connection between building occupants and the outdoor environment

Question 44

What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.

Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

40%

B.

50%

C.

60%

D.

70%

Question 45

Which of the following scenarios contributes towards the achievement of Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2. Quality Views?

Options:

A.

A workstation with a skylight directly above

B.

An office with windows that are completely covered by inoperable shades

C.

A glass conference room with a view of office plants

D.

An executive office with a view of a park

Question 46

What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?

Options:

A.

50%

B.

75%

C.

85%

D.

90%

Question 47

A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?

Options:

A.

Sensor calibration

B.

Test and balance procedures

C.

Cooling tower water management

D.

Operating schedules and requirements

Question 48

An Indoor Environmental Quality policy for facility maintenance and renovation activities under Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy must follow the recommended

Options:

A.

procedures in Indoor Environmental Quality Green Cleaning Policy, In-house Green Cleaning Policy thermal comfort strategies in American Society of Heating Refrigerating and Air Conditioning Engineers

(ASHRAE) 55-2010

B.

direct exhaust airflow measurement strategy using devices capable of measuring the exhaust airflow meeting fresh air requirements

C.

control measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor

D.

Environmental Quality Guidelines for Occupied Buildings Under Construction

Question 49

The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?

Options:

A.

Install a new high-efficiency chiller

B.

Purchase renewable energy credits

C.

Install new high efficiency urinal flush valves

D.

Provide financial support for off-site conservation