Halloween Special Limited Time Flat 70% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 70spcl

Scrum SAFe-SASM SAFe Advanced Scrum Master (SASM) Exam Practice Test

Page: 1 / 6
Total 60 questions

SAFe Advanced Scrum Master (SASM) Questions and Answers

Question 1

What is the purpose of the fishbone diagram?

Options:

A.

To identify the biggest root cause

B.

To brainstorm solutions to problems

C.

To identify improvement backlog items

D.

To identify potential root causes to problems

Question 2

What are two benefits of applying cadence? (Choose two.)

Options:

A.

To transform unpredictable events into predictable events

B.

To help teams increase their velocity

C.

To synchronize planningfor multiple teams and ARTs

D.

To ensure teams wait to integrate their changes on cadence boundaries

E.

Toensure teams nan accent new workat anytime

Question 3

When is collaboration with System Architects and the Systems Team likely to have the greatest impact on Solution development?

Options:

A.

At the System Demo

B.

At the Inspect and Adapt event

C.

During the daily stand-up

D.

During PI Planning

Question 4

When creating an Improvement Roadmap, what is one source of guidance for improving a team's technical practices?

Options:

A.

The Agile Program Management Office

B.

Communities of Practice

C.

The Lean Agile Center of Excellence

D.

The Solution Architect

Question 5

When should centralized decision-making be used?

Options:

A.

When there are significant economies of scale

B.

When decisions are short-term in duration

C.

When decisions need specific local context

D.

When making frequent decisions

Question 6

Which of the SAFe Core Values enables trust across the ART?

Options:

A.

Transparency

B.

Adaptation

C.

Built-in Quality

D.

Decentralized decision-making

Question 7

What is one way a Scrum Master leads the team's efforts for relentless improvement?

Options:

A.

By helping teams become better problem solvers

B.

By scheduling team meetings

C.

By building a high-performing team

D.

By focusing on technical discipline

Question 8

A Scrum Master is asked to help an Agile Release Train that has struggled through multiple Pls. They just finished the second Iteration in the current PI and have nothing to show at the System Demo. The ART stakeholders are concerned. What should be done?

Options:

A.

Stop working on any new functionality and fully integrate and test the system; adjust scope based on what is learned

B.

Have every team demonstrate their team increment to the stakeholders separately in the team branch

C.

Find a vendor that specializes in integrating system increments from multiple teams

D.

Re-architect the system so that there are no dependencies between the teams; integration is not required at this time

Question 9

What is one problem with phase-gate Milestones?

Options:

A.

They assume a point Solution exists and can be built right the first time

B.

They force design decisions too late in the process

C.

They account for variability inherent in the process

D.

They require the Product Owner to act as gatekeeper or guardian of the process

Question 10

Which two statements are true about a Feature? (Choose two.)

Options:

A.

It is developed within a single Agile Team

B.

It is fully completed by a single Agile Release Train within one PI

C.

It is prioritized using weighted shortest job first

D.

It has one Capability as a parent

Question 11

How is team performance calculated in SAFe?

Options:

A.

The ratio of tasks planned to tasks completed

B.

The ratio of business value achieved to business value planned for the PI

C.

The ratio of Story points completed to Story points planned in the PI

D.

Team member utilization as a percentage of total capacity

Question 12

Which statement is true about batch size, lead time, and utilization?

Options:

A.

Higher team member utilization leads to longer lead times

B.

There is no direct relationship between lead time and utilization

C.

As batch size increases, lead time decreases

D.

There is no direct relationship between lead time and batch size

Question 13

What is one outcome of an integration point?

Options:

A.

It provides an opportunity to pivot the course of action

B.

It extends the length of time of an Iteration

C.

It provides the opportunity to release code

D.

It aligns with a phase-gate milestone

Question 14

Which statement is true about large Stories?

Options:

A.

They make it difficult to apply iterative development

B.

They require additional refinement sessions to fully understand the scope

C.

They fit into one Iteration

D.

They should be split into multiple tasks

Question 15

Lee is a developer on the team. At every daily stand-up Lee reports, "Yesterday, I worked on indexing. Today, I will work on indexing. I have no impediments." What coaching should the Scrum Master provide Lee to improve the team's visibility into his work?

Options:

A.

Ask the team to break Lee's Stories into tasks for better understanding

B.

Assign another team member to assist Lee with indexing and ask Lee to start a different piece of work

C.

Tell Lee to pair with another team member

D.

Have Lee discuss his progress in the context of the Iteration goals

Question 16

What should be the first step a team should take to feed potential problems into the Problem Solving workshop?

Options:

A.

Identify enablers needed to build out the Architectural Runway

B.

Conduct a short team retrospective

C.

Review feedback from the System Demo

D.

Analyze quantitative & qualitative metrics

Question 17

What are three opportunities for creating collaboration on a team? (Choose three.)

Options:

A.

Pair work

B.

Iteration planning

C.

Communities of Practice

D.

Inspect and Adapt

E.

Hackathons

F.

Backlogrefinement

Question 18

What is the output of an Inspect and Adapt event?

Options:

A.

An updated Program Board

B.

A refined understanding of the problem statement

C.

A set of improvement items for the upcoming PI Planning event

D.

A new backlog for the team to work on in the upcoming PI

Page: 1 / 6
Total 60 questions