Question 1

What is the function or purpose of management in Scrum?

(choose the best answer)

Options:

A.

To identify and remove people that are not working hard enough.

B.

To monitor the productivity of the Developers.

C.

To present the Scrum Teams with insights and resources that help them improve.

D.

To continually monitor staffing levels of the Scrum Team.

Question 2

Which three of the following are time-boxed events in Scrum? (Choose three.)

Options:

A.

Release Testing.

B.

Release Retrospective.

C.

Sprint Retrospective.

D.

Sprint Planning.

E.

Sprint Testing.

F.

Sprint 0.

G.

Daily Scrum.

Question 3

What two techniques could the Scrum Master use when the Scrum Team gets caught in an internal disagreement about which development techniques to apply? (Choose two.)

Options:

A.

Involve the complete Development Team.

B.

Use coaching techniques; such as open questions and active listening.

C.

Ask an external technical specialist to make the decision.

D.

Send every team member to the company’s HR department to express their concerns.

Question 4

When does a Sprint conclude?

(choose the best answer)

Options:

A.

When the Product Owner decides enough has been delivered to meet the Sprint

Goal.

B.

When the Sprint Retrospective is complete.

C.

When all the tasks are completed by the Developers.

D.

When all Product Backlog items meet their Definition of Done.

Question 5

Several Sprints into a project, the Product Owner tells the Scrum Master that a key stakeholder just started using the product. The stakeholder is unhappy with the quality of the product, and the Product Owner agrees with the stakeholder’s assessment that the quality is low. How should the Scrum Master respond to the Product Owner?

(choose the best two answers)

Options:

A.

Encourage the Product Owner to include quality specifications in the Product Backlog and to communicate the stakeholders' concerns to the Developers.

B.

Bring the concern to the testers to improve how the Product is verified.

C.

Work with the Product Owner to understand their desired resolution and help formulate an approach for raising the concern with the Developers.

D.

Tell the Product Owner they have noted the concern and will raise this issue at the Sprint Retrospective.

E.

Explain to the Product Owner that it is up to the Developers to decide on acceptable quality standards.

Question 6

Who is responsible for the Sprint Backlog?

(choose the best answer)

Options:

A.

The Scrum Team.

B.

The Scrum Master.

C.

The Developers.

D.

The Product Owner.

Question 7

What enhances the transparency of an increment?

Options:

A.

Doing all work needed to meet the definition of “Done”

B.

Reporting Sprint progress to the stakeholders daily

C.

Keeping track of and estimating all undone work to be completed in a separate Sprint.

D.

Updating Sprint tasks properly in the electronic tracking tool.

Question 8

Who must attend the Daily Scrum?

Options:

A.

The Scrum Master and Product Owner.

B.

The Development Team.

C.

The Development Team and Product Owner.

D.

The Scrum Team.

E.

The Development Team and Scrum Master.

Question 9

What is the timebox for a Sprint Planning event? (choose the best answer)

Options:

A.

Monthly.

B.

8 hours for a one-month Sprint

C.

Whenever ills done

D.

4 hours for a one-month Sprint

Question 10

What are the two primary ways a Scrum Master keeps a Development Team working at its highest level of productivity? (Choose two.)

Options:

A.

By ensuring the meetings start and end at the proper time.

B.

By removing impediments that hinder the Development Team.

C.

By facilitating Development Team decisions.

D.

By keeping high value features high in the Product Backlog.

Question 11

Which of the following might the Scrum Team discuss during a Sprint Retrospective?

Options:

A.

Methods of communication.

B.

The way the Scrum Team does Sprint Planning.

C.

Skills needed to improve the Development Team’s ability to deliver.

D.

Its Definition of “Done”.

E.

All of the above.

Question 12

Which two things should the Development Team do during the first Sprint? (Choose two.)

Options:

A.

Make up a plan for the rest of the project.

B.

Analyze, describe, and document the requirements for the subsequent Sprints.

C.

Develop at least one piece of functionality.

D.

Analyze, design, and describe the complete architecture and infrastructure.

E.

Create an increment of potentially releasable software.

Question 13

During a Sprint Retrospective, for what is the Product Owner responsible?

Options:

A.

Participating as a Scrum Team member.

B.

Summarizing and reporting the discussions to the stakeholders that he/she represents in the Scrum Team.

C.

Capturing requirements for the Product Backlog.

D.

The Product Owner should not take part in Sprint Retrospectives.

Question 14

What happens if the Development Team cannot complete its work by the end of the Sprint?

Options:

A.

The Sprint is extended and future Sprints use this new duration.

B.

The Sprint length holds and the Development Team continuously learns what is actually possible to do within a Sprint of this length.

C.

The Sprint is extended temporarily. Lessons are taken to ensure it doesn’t happen again.

Question 15

A product Increment must be released to production at the end of each Sprint.

Options:

A.

True

B.

False

Question 16

The Product Owner determines how many Product Backlog items the Development Team selects for a Sprint.

Options:

A.

False.

B.

True, accordingly to what was committed to the stakeholders.

C.

True, but only after confirmation by the resource manager that the Team has enough capacity.

D.

True.

E.

False, the Scrum Master does that.

F.

False, capacity and commitment are the Project manager’s responsibility.

Question 17

When must a scrum Team release each increment? (choose the best answer)

Options:

A.

when the Scrum Team finishes their work

B.

Alter every Sprint. without exception

C.

Whenever the product s tree of detects

D.

When it makes sense to release It.

Question 18

Which three questions might be answered by Development Team members at the Daily Scrum? (Choose three.)

Options:

A.

How is the Sprint proceeding?

B.

What did I do yesterday that helped the Development Team meet the Sprint Goal?

C.

Why were you late?

D.

What will I do today to help the Development Team meet the Sprint Goal?

E.

How many hours did I spend on the project yesterday?

F.

What will I be working on tomorrow?

G.

Do I see any impediment that prevents me or the Development Team from meeting the Sprint Goal?

Question 19

Who is accountable for tracking the remaining work toward the Sprint Goal? (Choose the best answer.)

Options:

A.

The Developers.

B.

The Scrum Master.

C.

The Product Owner.

D.

The Project Manager.

Question 20

When multiple Scrum Teams are working on a single product, what best describes the Definition of Done?

(choose the best answer)

Options:

A.

The Scrum Masters from each Scrum Team define a common Definition of Done.

B.

Each Scrum Team defines and uses its own. The differences are discussed and reconciled during a hardening Sprint.

C.

When multiple Scrum Teams are working together on a product, they must mutually

define and comply with the same Definition of Done.

D.

Each Scrum Team uses its own, but must make their definition clear to all other teams so the differences are known.

Question 21

Which two activities will a Product Owner engage in during a Sprint? (Choose two.)

Options:

A.

Run the Daily Scrum.

B.

Prioritize the Development Team’s work on the Sprint Backlog.

C.

Update the Sprint burndown chart.

D.

Answer questions from the Development Team about items in the current Sprint.

E.

Work with the stakeholders.

Question 22

Who can cancel a Sprint?

(choose the best answer)

Options:

A.

The Scrum Master

B.

The Scrum Team.

C.

The Stakeholders.

D.

The Product Owner.

Question 23

How should a Scrum Team deal with non-functional requirements?

(choose the best answer)

Options:

A.

Manage them during the Integration Sprint prior to the Release Sprint.

B.

Assign them to the lead developers on the team.

C.

Ensure every Increment meets them.

D.

Make sure the release department understands these requirements, but it is not the

Scrum Team's responsibility.

Question 24

What factor should be considered when establishing the Sprint length?

(choose the best answer)

Options:

A.

The organization has mandated similar length sprints.

B.

The need for the team to learn based on doing work and measuring results.

C.

The frequency at which team formation can be changed.

D.

The organization's release schedule.

Question 25

Which of the following are true about the length of the Sprint? (Choose two.)

Options:

A.

The length of the Sprint should be proportional to the work that is done in between Sprints.

B.

It is best to have Sprints of consistent length throughout a development effort.

C.

Sprint length is determined during Sprint Planning, and should hold the time it will take to code the planned features in the upcoming Sprint, but does not include time for any testing.

D.

Sprint length is determined during Sprint Planning, and should be long enough to make sure the Development Team can deliver what is to be accomplished in the upcoming Sprint.

E.

All Sprints must be 1 month or less.

Question 26

Why should the Product Owner be present at the Daily Scrum?

Options:

A.

He/She doesn’t need to be there.

B.

To hear about impediments in functionality.

C.

To represent the stakeholders’ point of view.

D.

To participate as a Scrum Team member.

Question 27

During the Sprint. Me Scrum Master's role is to do which two of the following: (choose the best two answers)

Options:

A.

Facilitate inspection and adaptation opportunities as requested or needed

B.

Coaching the team members in self-management

C.

Ensure the Product Owner attends all scrum events.

D.

Escalate team conflicts to functional line managers

E.

Monitor the progress of the Developers

F.

Assign tasks with the Scrum team.

Question 28

During the Sprint Retrospective a Scrum Team has identified several high priority process improvements.

Which of the following statements is most accurate? (Choose the best answer.)

Options:

A.

The Scrum Team may add items to the Sprint Backlog for the next Sprint.

B.

The Scrum Team should choose at least one high priority process improvement to place in the Product

Backlog.

C.

The Scrum Team should decline to add a process improvement to the Sprint Backlog when things are

running smoothly.

D.

The Scrum Master selects the most important process improvement and places it in the Sprint Backlog

Question 29

Who is accountable for clearly expressing Product Backlog items? (Choose the best answer.)

Options:

A.

The business analyst who represents the Product Owner.

B.

The Product Owner.

C.

The Scrum Master, or the Scrum Master may have the Developers do it.

D.

The Scrum Master.

Question 30

Who determines how many Product Backlog items the Developers select tor a sprint? (choose the best answer)

Options:

A.

The Scrum Master

B.

The Scrum Team

C.

The Developers

D.

The stakeholders attending Sprint Planning

E.

The Product Owner

Question 31

If burndown charts are used to visualize progress, what does a trend line through a release burndown chart indicate?

Options:

A.

The evolution of the cost spent on the project.

B.

When all work will be completed to the Scrum Team can be released for other work.

C.

When the work remaining will likely be completed if nothing changes on the Product Backlog or the Development Team.

D.

When the project will be over if the Product Owner removes work that is equal in effort to any new work that is added.

Question 32

Currently, your Development Teams are organized to address a single layer only (for example, front end, middle tier, back end, and interfaces). What are three things to consider when deciding to move away from such component teams toward feature teams? (Choose three.)

Options:

A.

You cannot do Scrum without feature teams.

B.

Productivity may suffer when making this kind of move.

C.

Getting support from the business side first helps.

D.

Feature teams have less communication overhead.

E.

With feature teams, it is easier to calculate the productivity per team.

Question 33

Which statement best describes Scrum?

Options:

A.

A defined and predictive process that confirms to the principles of Scientific Management.

B.

A complete methodology that defines how to develop software.

C.

A cookbook that defines best practices for software development.

D.

A framework within which complex products in complex environments are developed.

Question 34

Who creates a Product Backlog Item’s estimate?

Options:

A.

The Development Team after clarifying requirements with the Product Owner.

B.

The Product Owner with input from the Development Team.

C.

The most senior people in the organization, including architects and subject matter experts.

D.

The Scrum Master.

E.

The Development Team, alone.

Question 35

What is the timebox for the sprint Review? (choose the best answer)

Options:

A.

1 day

B.

4 hours for a one-month Sprint.

C.

As long as needed

D.

2 hours for a one-month Sprint.

Question 36

Several Sprints into a project, the Product Owner tells the Scrum Master that a key stakeholder just started

using the product. The stakeholder is unhappy with the quality of the product. What are two good options for the

Scrum Master? (Choose the best two answers.)

Options:

A.

Wait to bring this up until the Sprint Retrospective.

B.

Encourage the Product Owner to put quality specifications on the Product Backlog and express the

stakeholder’s concern to the Developers.

C.

Bring the concern to the testers to improve how the Product is verified.

D.

Explain to the Product Owner that it is up to the Developers to decide on acceptable quality standards.

E.

Coach the Product Owner on how to talk with the Developers about this concern.

Question 37

When is it most appropriate for a Scrum Team to change the definition of “Done”?

Options:

A.

During Spring Planning.

B.

Prior to starting a new Sprint.

C.

During the Sprint Retrospective.

D.

Prior to starting a new project.

Question 38

What is the typical size for a Scrum Team?

(choose the best answer)

Options:

A.

7 plus or minus 3.

B.

At least 7.

C.

9

D.

10 or fewer.

Question 39

When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint?

Options:

A.

Yes, but only for Scrum Teams whose work has dependencies.

B.

Yes, otherwise the Product Owners (and stakeholders) may not be able to accurately inspect what is done.

C.

No, each Scrum Team stands alone.

D.

No, that is far too hard and must be done in a hardening Sprint.

Question 40

When many Scrum Teams are working on a single product, what best describes the Definition of Done?

(Choose the best answer.)

Options:

A.

Each Scrum Team defines and uses its own. The differences are discussed and reconciled during a

hardening Sprint.

B.

The Scrum Masters from each Scrum Team define a common Definition of Done.

C.

Each Scrum Team uses its own, but must make their definition clear to all other teams so the differences are known.

D.

All Scrum Teams must have a Definition of Done that makes their combined work potentially releasable.

Question 41

A Scrum Team is experiencing a growing list of impediments. Which techniques would be most

helpful in this situation?

(choose the best two answers)

Options:

A.

As a Scrum Team, prioritize the list and work on them in order.

B.

The Scrum Master discusses the impediments with the Scrum Team.

C.

The Product Owner should add the open impediments to the Product Backlog.

D.

Arrange a triage meeting with management.

Question 42

When Goes a Developer become accountable for the value 01 a Product BacKlog item selected for the Sprint'

(choose the best answer)

Options:

A.

Never The entire Scrum Team is accountable for creating value every Sprint.

B.

At the Sprint Planning Evented

C.

Whenever a team member can accommodate more worn.

D.

During the Daily scrum

Question 43

A Scrum Master is keeping a list of open impediments, but it is growing and he/she has been able to resolve only a small portion of the impediments. Which three techniques would be most helpful in this situation? (Choose three.)

Options:

A.

Consulting with the Development Team.

B.

Prioritizing the list and working on them in order.

C.

Arranging a triage meeting with all project managers.

D.

Alerting management to the impediments and their impact.

Question 44

The length of a Sprint should be:

Options:

A.

Short enough to keep the business risk acceptable to the Product Owner.

B.

Short enough to be able to synchronize the development work with other business events.

C.

No more than one calendar month.

D.

All of these answers are correct.

Question 45

The Sprint Goal is a result of Sprint Planning, as is the Sprint Backlog.

Options:

A.

True

B.

False

Question 46

True or False Developers do not meet with stakeholders: only the Product Owner meets with stakeholders

Options:

A.

True

B.

False

Question 47

Which two ways of creating Development Teams are consistent with Scrum’s values? (Choose two.)

Options:

A.

Existing teams propose how they would like to go about organizing into the new structure.

B.

Managers personally re-assign current subordinates to new teams.

C.

Managers collaborate to assign individuals to specific teams.

D.

Bring all the developers together and let them self-organize into Development Teams.

E.

The Chief Product Owner determines the new team structures and assignments.

Question 48

When multiple teams work together on the same product, each team should maintain a separate Product Backlog.

Options:

A.

True

B.

False

Question 49

Who starts the Daily Scrum?

Options:

A.

The person coming in last. This encourages people to be on time and helps to stay within the time-box.

B.

Whoever the Development Team decides should start.

C.

The person who has the token.

D.

The Scrum Master. This ensures that the Development Team has the meeting and stays within the time-box.

E.

The person who last broke the build.

Question 50

The Product Owner is not collaborating with the Development Team during the Sprint. What are two valuable actions for a Scrum Master to take? (Choose two.)

Options:

A.

Inform the Product Owner’s functional manager.

B.

Stop the Sprint, send the Product Owner to a course and restart.

C.

Bring up the problem in the Sprint Retrospective.

D.

Coach the Product Owner in the values of Scrum and incremental delivery.

E.

Nominate a proxy Product Owner.

Question 51

What is the accountability of the Product Owner during Sprint 0? (Choose the best answer.)

Options:

A.

There is no such thing as Sprint 0.

B.

Gathering, eliciting, and analyzing the requirements that will be inserted into the Product Backlog.

C.

Make the complete project plan to commit date, budget, and scope to the stakeholders.

D.

Determine the composition of the Development Teams so they have the capacity to deliver the completed

forecast.

E.

Make sure enough Product Backlog items are refined to fill the first 3 Sprints.

Question 52

Every Scrum team must have a Product Owner and Scrum Master.

Options:

A.

True. Outcomes affected by their participation and availability.

B.

False. A Product Owner can be replaced by a business analyst in the Development Team.

C.

False. A Scrum Master is only required when asked for by the Development Team.

D.

True. Each must be 100% dedicated to the Scrum Team.

Question 53

A Product Owner wants advice from the Scrum Master about estimating work in Scrum. Which of these is the guideline that a Scrum Master should give? (Choose the best answer.)

Options:

A.

Product Backlog items must be estimated in story points.

B.

Estimates are made by the people doing the work.

C.

Estimates must be in relative units.

D.

Scrum forbids estimating.

E.

Estimates are made by the Product Owner, but are best checked with the Development Team.

Question 54

What are three benefits of self-organization? (Choose three.)

Options:

A.

Increased creativity.

B.

Increased rule compliance.

C.

Increased accuracy of estimates.

D.

Increased self-accountability

E.

Increased commitment.

Question 55

The IT manager asks a Development Team for a status report describing the progress throughout the Sprint.

The Development Team asks the Scrum Master for advice. The Scrum Master should:

(Choose the best answer.)

Options:

A.

Talk to the IT manager and explain that progress in Scrum comes from inspecting an Increment at the Sprint Review.

B.

Tell the Development Team to figure it out themselves.

C.

Tell the Development Team to fit the report into the Sprint Backlog.

D.

Create and deliver the report to the manager herself.

E.

Ask the Product Owner to send the manager the report.

Question 56

Which answer best describes the topics covered in Sprint Planning? (Choose the best answer.)

Options:

A.

What to do and who will do it.

B.

How conditions have changed and how the Product Backlog should evolve.

C.

What can be done and how to do it, and why to do it.

D.

What went wrong in the last Sprint and what to do differently this Sprint.

E.

Who is on the team and what team member roles will be.

Question 57

Which are appropriate topics for discussion in a Sprint Retrospective? (Choose the best three answers.)

Options:

A.

Arranging the Sprint Backlog for the next Sprint.

B.

The value of work currently represented in the Product Backlog.

C.

Team relations

D.

Definition of Done.

E.

How the Scrum Team does its work.

Question 58

Which of these may a Scrum Team deliver at the end of a Sprint?

(choose the best answer)

Options:

A.

A single document, if that is what management asked for.

B.

A valuable, useful Increment that meets the Definition of Done.

C.

Failing unit tests, to identify acceptance tests for the next Sprint.

D.

An Increment of software with minor known bugs in it.

Question 59

What is the function or purpose of management in Scrum?

(choose the best answer)

Options:

A.

To identify and remove people that are not working hard enough.

B.

To present the Scrum Teams with insights and resources that help them improve.

C.

To monitor the productivity of the Developers.

D.

To continually monitor staffing levels of the Scrum Team.

Question 60

Marian is the Product Owner envisioning a project for a new release of her product. She made a projection of a release date based upon a sustained velocity of 17 completed units of work per Sprint. Over the first 3 Sprints, the average velocity was 13 for work that the Development Team estimated as 90% done. The Development Teams, feeling the need to meet the plan, figured that a velocity of 17 was within their reach.

A good way to continue is:

Options:

A.

The Development Team makes sure that all of the selected scope per Sprint is as “Done” as possible. The undone work is estimated and added to the Sprint Backlog of the next Sprint, so it doesn’t mess up the Product Backlog.

B.

Add enough people to the Development Team for the deadline to be made.

C.

The opportunity to inspect and adapt is lost. Opaqueness has replaced transparency. Predictability has dropped below zero. The produced software is not usable. As the rules of Scrum have not been respected, it is the Scrum Master’s duty to assess whether repair is possible, or a restart with a more reliable team. If not, the Scrum Master should cancel the project.

D.

The Development Team should remind Marian to find funding for enough Release Sprints in which the remaining work can be done.

Question 61

One of the Scrum events is the Daily Scrum. What are two intended outcomes of the Daily Scrum?

(choose the best two answers)

Options:

A.

Identification of impediments that may prevent the Developers from achieving the Sprint Goal.

B.

An update of completed tasks and of the remaining work so the Scrum Master

can plan the next day.

C.

An updated Scrum board to make Sprint progress transparent for the

stakeholders.

D.

A shared understanding of the most important work to be undertaken next to

achieve the best possible progress toward the Sprint goal.

E.

A status report for the upper management indicating what each individual has done, will be doing, and what is impeding him/her.

Question 62

One of the Scrum events is the Daily Scrum. What are two intended outcomes of the Daily Scrum? (Choose two.)

Options:

A.

A shared understanding of the most important work to be undertaken next to achieve the best possible progress toward the Sprint goal.

B.

An update of completed tasks and of the remaining work so the Scrum Master can plan the next day.

C.

A status report for the upper management indicating what each individual has done, will be doing, and what is impending him/her.

D.

An updated Scrum board to make Sprint progress transparent for the stakeholders.

E.

New impediments for the Scrum Master to take care of.

Question 63

Which two things are appropriate for a Scrum Master to do if the Development Team doesn’t have the engineering tools and infrastructure to completely finish each selected Product Backlog item? (Choose two.)

Options:

A.

Coach the Development Team to improve its skills, tools, and infrastructure over time and adjust the Definition of “Done” accordingly.

B.

Encourage the Product Owner to accept partially “Done” increments until the situation improves.

C.

Refocus the current Sprint on establishing the Development Team’s infrastructure instead of delivering an increment.

D.

Declare the Development Team not ready for Scrum.

E.

Have the Development Team establish a Definition of “Done” that is actually possible to achieve given current circumstances.

Question 64

Which of the following are true about the Product Owner role? (Choose two.)

Options:

A.

The Product Owner is one person.

B.

The Product Owner is accountable for ordering the Product Backlog.

C.

Multiple people can share the Product Owner role on a Scrum Team.

D.

The Product Owner role can be played by a committee or a team of people.

Question 65

Which two activities will a Product Owner engage in during a Sprint? (Choose two.)

Options:

A.

Run the Daily Scrum.

B.

Prioritize the Development Team’s work on the Sprint Backlog.

C.

Update management on what is being worked on.

D.

Answer QUESTION NO:s from the Development Team about items in the current Sprint.

Question 66

How is management external to the Scrum Team involved in the Daily Scrum?

Options:

A.

The Scrum Master speaks on their behalf.

B.

The Development Team self-manages and is the only management required at the Daily Scrum.

C.

Management gives an update at the start of each Daily Scrum.

D.

The Product Owner represents their opinions.

Question 67

True or False: The Sprint Backlog is a result of Sprint Planning, and it includes the Sprint Goal.

Options:

A.

True

B.

False

Question 68

The purpose of a Sprint is to produce a done Increment of product.

Options:

A.

True

B.

False

Question 69

A Development Team selects a set of Product Backlog items for a Sprint Backlog with the intent to get the selected items “Done” by the end of the Sprint. Which three phrases best describe the purpose of a definition of “Done”? (Choose three.)

Options:

A.

It controls whether the developers have performed their tasks.

B.

It provides a template for elements that need to be included in the technical documentation.

C.

It creates transparency over the work inspected at the Sprint Review.

D.

It trucks the percent completeness of a Product Backlog item.

E.

It guides the Development Team is creating a forecast at the Sprint Planning.

F.

It defines what it takes for an Increment to be ready for release.

Question 70

Which outcome is expected as Scrum Teams mature?

Options:

A.

They will improve their definition of “Done” to include more stringent criteria.

B.

The Sprint Retrospectives will grow to be longer than 4 hours.

C.

There is no need for a time-boxed Sprint, since time-boxes are only for new Scrum Teams.

D.

Sprint Reviews will no longer be needed.

E.

A Scrum Master is no longer needed since they are a mature team now.

Question 71

Scrum is a methodology that tells in detail how to build software incrementally.

Options:

A.

True

B.

False

Question 72

Sprint burndown charts are an efficient tracking tool, because they show:

Options:

A.

An estimate of the total work remaining for the Sprint.

B.

How much effort has gone into a Sprint.

C.

How many hours have been worked by each Development Team member.

D.

How many Product Backlog items remain.

Question 73

What are two ways that regulatory compliance issues are dealt with in Scrum?

(choose the best two answers)

Options:

A.

They are addressed by a separate team who is responsible for compliance

issues.

B.

They are addressed along with functional development of the product.

C.

They are discussed, determined, and documented before the actual feature

development Sprints.

D.

They are added to the Product Backlog and addressed in early Sprints, while

always requiring at least some business functionality, no matter how small.

Question 74

How should Product Backlog items be chosen when multiple Scrum Teams work from the same Product Backlog?

Options:

A.

The Scrum Team with the highest velocity pulls Product Backlog items first.

B.

The Development Teams pull in work in agreement with the Product Owner.

C.

The Product Owner should provide each team with its own Product Backlog.

D.

Each Scrum Team takes an equal numbers of items.

E.

The Product Owner decides.

Question 75

Who has the final decision about the order of items in the Product Backlog? (Choose the best answer.)

Options:

A.

The Stakeholders.

B.

The Product Owner.

C.

The Scrum Team.

D.

The Scrum Master.

E.

The Developers.

Question 76

What is the purpose of a Sprint Review?

Options:

A.

To take time to judge the validity of the project.

B.

To inspect the product increment with the stakeholders and collect feedback on next steps.

C.

To review the Scrum Team’s activities and processes during the Sprint.

D.

To build team sprint.

Question 77

Which of the following best describes an increment of working software?

Options:

A.

A decomposition of all Product Backlog items into tasks for future Sprint Backlog lists.

B.

Additional features in a usable state that complement those delivered in previous iterations.

C.

A new user interface design for functionality delivered in previous iterations.

D.

An automated test suite to verify functionality delivered in previous iterations.

E.

UML diagrams that describe how to deliver functionality in future iterations.

Question 78

During a Sprint Retrospective, the Development Team proposes moving the Daily Scrum to only occur on Tuesdays and Thursdays. Which two are the most appropriate responses for the Scrum Master? (Choose two.)

Options:

A.

Consider the request and decide on which days the Daily Scrum should occur.

B.

Coach the team on why the Daily Scrum is important as an opportunity to update the plan.

C.

Have the developers vote.

D.

Learn why the Development Team wants this and work with them to improve the outcome of the Daily Scrum.

E.

Acknowledge and support the self-organizing team’s decision.

Question 79

Which of the following are roles on a Scrum Team? (Choose all that apply.)

Options:

A.

Users

B.

Scrum Master

C.

Product Owner

D.

Development Team

E.

Customers

Question 80

A new Developer is having continuing conflicts with existing members or the scrum Team, which is impacting the delivery of the Increment It necessary, who is responsible for removing the Developer from the Scrum Team?

(choose the best answer)

Options:

A.

The Scrum Master is responsible, they remove impediments

B.

The Product Owner is responsible, they control the return on investment (ROI)

C.

The hiring manager is responsible, they hired the Developer

D.

The Scrum Team is responsible