New Year Special Limited Time Flat 70% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 70spcl

SAP E_S4HCON2023 SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Exam Practice Test

Page: 1 / 8
Total 79 questions

SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Question 1

When using the DMO of SUM, which files can be handled by SUM in the download directory?

There are 2 correct answers to this question.

Response:

Options:

A.

Parameter file SAPup_add.par

B.

Stack XML file calculated by the Maintenance Planner

C.

Breakpoint configuration file SAPUPPHAS.BRK

D.

MIGRATE J5T_DUR_XML file from a previous run

Question 2

Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?

There are 2 correct answers to this question.

Response:

Options:

A.

Create "modified* versions of the objects that you need to adjust

B.

Release the transport request containing the modification adjustment

C.

Assign the transport request as a modification adjustment transport

D.

Manually activate the adjusted dictionary objects

Question 3

You are running an SAP ECC system.

For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?

Note There are 3 correct answers to this question

Options:

A.

Upgrade the SAP system

B.

Perform an SAP S/4 HANA conversion without DMO

C.

Perform an SAP S/4 HANA conversion including DMO

D.

Apply SAP support packages

E.

Use DMO for SUM

Question 4

During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?

There are 2 correct answers to this question.

Response:

Options:

A.

In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

B.

In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log

C.

In the job log for the corresponding job in SM37 (Job Overview)

D.

In the corresponding R3trans log files of this phase

Question 5

You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

Options:

A.

The SAP S/4HANA Conversion is without DMO.

B.

The SAP S/4HANA Conversion includes a DMO.

C.

The start release is too old for DOC.

D.

The source database is not supported

Question 6

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?

Please choose the correct answer.

Response:

Options:

A.

Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

B.

Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

C.

Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

D.

Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Question 7

You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?

There are 2 correct answers to this question.

Response:

Options:

A.

Conversion of application tables (PARCONV_UPG)

B.

Activation of dictionary objects (ACT_UPG)

C.

Switch to new repository (EU_SWITCH)

D.

Modification adjustment (SPDD)

Question 8

Which preparational steps must be performed for an SAP S/4HANA conversion?

There are 2 correct answers to this question.

Response:

Options:

A.

Uninstall industry extensions not supported by SAP S/4HANA

B.

Install add-on SAP Gateway 7.50

C.

Uninstall Fiori apps not released for SAP_UI 7.50

D.

Delete client 066 (Early Watch Client)

Question 9

You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?

Please choose the correct answer.

Response:

Options:

A.

An additional temporary database is used during uptime

B.

Dedicated application tables are migrated in uptime

C.

TABIMJJPG is executed in uptime

D.

The repository is migrated in uptime

Question 10

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?

There are 2 correct answers to this question.

Response:

Options:

A.

Run the database migration to the SAP HANA database

B.

Perform the migration of data into the new data structure

C.

Check the compatibility of custom code with SAP S/4HANA

D.

Apply the recommendations of the simplification list

Question 11

You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?

There are 2 correct answers to this question.

Options:

A.

Kernel for target release, Windows, SAP MaxDB

B.

Kernel for target release, Linux, SAP HANA

C.

Kernel for target release, Windows, SAP HANA

D.

Kernel for source release, Windows, SAP MaxDB

Question 12

What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?

There are 3 correct answers to this question.

Response:

Options:

A.

Phases DIFF*

B.

Phase DOWNCONF_DTTRANS

C.

Phase RUN_RSPTBFIL _ISUTABU

D.

Phases EU_IMPORT*

E.

Phase RUN_RSDBSCPY

Question 13

The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?

There are 2 correct answers to this question.

Response:

Options:

A.

Check the most recent entries shown in file sapevt.trc

B.

Check the system log (transaction SM21) of the SAP system

C.

Check the messages shown by the SUM UI

D.

Check the most recent entries in SAPup.log

Question 14

You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

Options:

A.

AA

B.

As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.

Question 15

In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

Options:

A.

When performing an SAP S/4HANA conversion with DMO

B.

When performing an SAP S/4HANA conversion without u DMO

C.

When upgrading an SAP S/4HANA Server system

D.

When upgrading an SAP ECC system with DMO

Question 16

During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

Options:

A.

SUM continues with the next phase and your modifications are kept as In the start release

B.

SUM continues with the next phase and your modifications are lost

C.

Before continuing with the next phase SUM asks for a modification adjustment transport

D.

SUM refuses to continue unless you have marked a transport request as modification adjustment transport

Question 17

You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?

Options:

A.

As part of the cleanup process

B.

Before the downtime starts

C.

Early in the downtime

D.

At the end

Question 18

You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?

Please choose the correct answer.

Response:

Options:

A.

Before the downtime starts

B.

At the end of the downtime

C.

As part of the cleanup process

D.

Early in the downtime

Question 19

Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

Options:

A.

Target DB size will increase temporarily

B.

A

C.

DMO can only be run with systems NW740 or NW731

Question 20

Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

Options:

A.

Shadow on target creation

B.

Downtime conversion

C.

Silent data migration (SDM)

D.

Downtime migration

Question 21

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

Options:

A.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion SAP S/4HANA conversion without database migration Database migration

D.

SAP S/4HANA conversion including database migration and Unicode conversion

E.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Question 22

Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

Options:

A.

Downtime Optimized DMO (DoDMO)

B.

Near-Zero Downtime Maintenance (nZDM)

C.

Near-Zero Downtime Technology (NZDT)

D.

Downtime Optimized Data Conversion (DoC)

Question 23

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

Options:

A.

After SUM has ended

B.

During the Execution roadmap step

C.

Before the start of the SUM technical downtime

D.

During the SUM technical downtime

Page: 1 / 8
Total 79 questions