SAP C_TS422_2021 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Exam Practice Test

Page: 1 / 8
Total 82 questions

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions and Answers

Question 1

You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material

shortage.

What must you do?

Options:

A.

Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

B.

Set the creation indicator for purchase requisitions on initial screen of MRP run

C.

Add the agreement to the source list and mark it for MRP revalance.

D.

Add the agreement to the quota arrangement and mark it for MRP revalance.

Question 2

Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Non-stock item

B.

Work item

C.

Variable-size item

D.

WBS item

Question 3

Which materials have a negative quantity in a bill of materials or in a recipe?

Options:

A.

Bulk materials

B.

Co-products

C.

By-products

D.

Waste products

E.

Continuous flow materials

Question 4

How can you limit the validity of a bill of material (BOM)?

Options:

A.

By plant

B.

By material type

C.

By industry

D.

By period

Question 5

Which SAP application can be used for forcasting in Supply Chain Planning?

Options:

A.

Material Requirements Planning (MRP)

B.

Supply Chain Management(SCM)

C.

Integrated Business Planning (IBP)

D.

Capacity Requirements Planning (CRP)

Question 6

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

Options:

A.

Make-to-order production (20)

B.

Planning at assembly level (70)

C.

Planning with final assembly (40)

D.

Planning without final assembly (50)

Question 7

What does a line hierarchy in repetitive manufacturing represent?

Options:

A.

A production line with a parallel sequence in the routing

B.

A production line with prioritized alternative work centers

C.

A production line with more than one work center

D.

A production line with an alternative sequence in the routing

Question 8

An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

Options:

A.

MRP group

B.

Plants parameters

C.

MRP controller

D.

MRP profile

Question 9

Which information is required when you created a production master in SAP S/4HANA?

Options:

A.

Selective screen for views

B.

Product type

C.

Base unit of measure

D.

Industry sector

Question 10

Which time elements are relevant for lead time scheduling of a production order?

Options:

A.

Float after production

B.

Planned delivery time

C.

Total replenishment lead time

D.

Setup time

Question 11

Why would you use phantom assemblies?

Options:

A.

To simplify the structure of bills of materials

B.

To make the assignment of components easier

C.

To reduce the number of changes required in bills of materials

D.

To reduce the number of material masters

E.

To increase the number of planning levels

Question 12

When can the automatic material availability check occur in a production order?

Options:

A.

At order release

B.

At order confirmation

C.

At order creation

D.

At order settlement