Question 1

Which of the following can be used as a performance indicator to evaluate the performance of the BCMS?

Options:

A.

The number of employees in the organization.

B.

The average cost of a disruption.

C.

The percentage of the assets damaged within a timeframe.

Question 2

What is one of the responsibilities of an internal auditor?

Options:

A.

Prepare the organization for external audits.

B.

Determine and ensure the provision of all necessary resources for the audit.

C.

Schedule the frequency of internal audits.

Question 3

Scenario:

Prebank is a multinational financial institution. Its services include banking and investing through banking centers, ATMs, and mobile banking platforms. With millions of clients, Prebank's database systems record vast amounts of data and transactions daily. Its main activities depend on the ability of its employees to access clients' data through its database system at any time.

Recently, Prebank's database system stopped working unexpectedly. Soon after, it was discovered that this disruption was caused by the maintenance work on the road outside the company's office building. During the road repair, the workers had unintentionally damaged a water pipe that leaked into Prebank's basement. This leakage affected the company's electrical infrastructure, resulting in a loss of power, which shut down equipment and computers in the server room. Consequently, employees were unable to access Prebank's database system.

After this incident, the employees immediately notified Prebank's IT team. Subsequently, the IT team informed both the maintenance company responsible for the roadworks and the insurance company. The company responsible for maintenance told Prebank's IT team that the maintenance team was not available for the day. Since Prebank did not have a plan for responding to similar disruptions, they had to stop working and go home. Thankfully, the maintenance team arrived at the scene on the next day and made all the necessary repairs, allowing Prebank to resume all its operations.

Following these events, Prebank decided to change its strategy and procedures to prioritize business continuity planning within the company. Its main focus was to address the root cause of disruptions to improve business continuity. As such, the top management decided to implement a Business Continuity Management System (BCMS) based on ISO 22301.

After setting the company's business continuity objectives, the company established a project team, including a project manager and four additional team members. The BCM team was responsible for managing the BCMS implementation process, whereas the top management was responsible for the effectiveness of the BCMS. Through analyzing potential risk scenarios, the team defined Prebank's business continuity strategy as well as the resources for supporting business continuity within the company. This enabled the team to predict the impact of disruptions caused by various incidents,such as power outages. Following these actions, the company established a business continuity plan to manage disruptions effectively without impacting the workflow.

The effective implementation of the BCMS helped Prebank not only minimize losses and ensure continuity in its services but also absorb and adapt to a changing environment.

According to ISO 22301, which of the following features pertains to a disruption?

Options:

A.

Incident that causes a negative deviation from the expected delivery of products and services.

B.

Unstable condition involving an abrupt or significant change that requires urgent attention and action.

C.

Situation where human, material, economic, or environmental losses have occurred.

Question 4

Scenario:

Clicked is a law firm that handles complex clients' needs and offers a wide range of legal and tax services. Clicked’s professionals are equipped with an in-depth knowledge of the legal and regulatory requirements. They are committed to providing their clients with the best services and legal advice. Considering that it is essential to meet their clients' needs, Clicked decided to implement a BCMS based on ISO 22301 to provide them uninterrupted services.

To implement the BCMS, the top management of Clicked decided to contract an external consultant, Tris, as the BCMS project manager, and assembled a team of four members to aid in the process. Prioritizing a smoother integration of the BCMS, the top management focused on incorporating it into the company's existing operational procedures. Additionally, the top management and the project team chose to adopt the Plan-Do-Check-Act (PDCA) model as their implementation approach, allowing for a systematic and phased approach to establishing and maintaining the BCMS.

Then, the top management and Tris compiled a document containing the financial benefits and consequences of every decision they were going to make during the implementation of the BCMS. The top management also agreed that the project implementation should be finalized within a six-month timeframe, encompassing planning through the completion of the last implementation stage.

The project team initiated the implementation process by analyzing the company's internal and external context. This involved evaluating Clicked’s compliance with all applicable legal requirements and understanding the key services, necessary activities, and resource allocation, including staff expertise and technological tools. Based on this analysis, the top management and Tris established specific business continuity objectives. Their primary goal was to ensure that all critical legal services could be resumed within a two-hour timeframe following any disruptive incident to minimize client impact.

Based on Scenario 2, during which stage of the PDCA cycle was the analysis of the internal and external context of Clicked conducted?

Options:

A.

During the 'Plan' stage.

B.

During the 'Act' stage.

C.

During the 'Do' stage.

Question 5

Scenario:

Teleconn, a UK-based telecommunications provider, initiated a BCMS based on ISO 22301 to ensure reliable and consistent services. To monitor the BCMS’s performance, the internal audit function was outsourced to a company specializing in auditing services. The outsourced internal auditor was given unrestricted access to employees and documented information necessary for an effective audit.

According to Scenario 6, based on management reviews, the top management decided to establish new performance indicators to measure the effectiveness of the updated controls, including real-time monitoring of network stability and incident response times. What did the top management determine in this case?

Options:

A.

Management review resources

B.

Management review inputs

C.

Management review outputs

Question 6

Scenario:

Headquartered in Sri Lanka, Operons Inc. is a freight forwarding company that adopted a BCMS aligned with ISO 22301. Prior to the certification audit, Operons Inc. measured gaps between their BCMS and the standard's requirements to ensure compliance. The certification body was contracted to conduct the audit, and a biased auditor from a previous ISO 9001 audit was replaced upon request. During the audit, two minor nonconformities were identified, and the audit team issued a recommendation for certification.

Based on Scenario 8, Operons Inc. contracted the same certification body that had conducted the ISO 9001 audit and requested more information about the competence and skills of the audit team. Is this acceptable?

Options:

A.

No, the same certification body cannot be contracted to audit two management systems in the same organization.

B.

No, the auditee cannot ask about the competence and skills of the audit team; that is the responsibility of the certification body.

C.

Yes, competence and skills of the audit team are among the main criteria in selecting a certification body.

Question 7

Scenario:

Clicked is a law firm that handles complex clients' needs and offers a wide range of legal and tax services. Clicked’s professionals are equipped with an in-depth knowledge of the legal andregulatory requirements. They are committed to providing their clients with the best services and legal advice. Considering that it is essential to meet their clients' needs, Clicked decided to implement a BCMS based on ISO 22301 to provide them uninterrupted services.

To implement the BCMS, the top management of Clicked decided to contract an external consultant, Tris, as the BCMS project manager, and assembled a team of four members to aid in the process. Prioritizing a smoother integration of the BCMS, the top management focused on incorporating it into the company's existing operational procedures. Additionally, the top management and the project team chose to adopt the Plan-Do-Check-Act (PDCA) model as their implementation approach, allowing for a systematic and phased approach to establishing and maintaining the BCMS.

Then, the top management and Tris compiled a document containing the financial benefits and consequences of every decision they were going to make during the implementation of the BCMS. The top management also agreed that the project implementation should be finalized within a six-month timeframe, encompassing planning through the completion of the last implementation stage.

The project team initiated the implementation process by analyzing the company's internal and external context. This involved evaluating Clicked’s compliance with all applicable legal requirements and understanding the key services, necessary activities, and resource allocation, including staff expertise and technological tools. Based on this analysis, the top management and Tris established specific business continuity objectives. Their primary goal was to ensure that all critical legal services could be resumed within a two-hour timeframe following any disruptive incident to minimize client impact.

To facilitate the implementation of the BCMS, the top management prioritized integrating the BCMS within Clicked’s current operational processes. Is this acceptable?

Options:

A.

Yes, the organization can rely on its existing processes without the need to assess their maturity.

B.

Yes, the BCMS should be integrated into existing processes by using the organization's current technology.

C.

No, the current processes of the organization must be changed and updated to adjust to the BCMS processes.

Question 8

Scenario:

Alex, the project manager of the BCMS implementation project at Company ZY, developed a process to identify the required resources for establishing the BCMS. He discovered that the company lacked a well-integrated communication and information system and also needed additional office space to accommodate new hires.

What resources did the company need?

Options:

A.

Equipment and financial resources

B.

Infrastructure and logistic resources

C.

Human and equipment resources

Question 9

How should organizations determine the intervals for training?

Options:

A.

Random intervals in order to avoid predictability and foster adaptability.

B.

Fixed intervals in order to establish consistent planning of training programs and regular training tracking.

C.

Based on the specific responsibilities and needs of personnel in order to fulfill organizational needs.

Question 10

Scenario:

Marketiser, a marketing company in Florida specializing in branding, advertising, market research, and design services, primarily serves small and medium-sized enterprises. After a devastating hurricane caused severe flooding and rendered its office unusable, Marketiser decided to implement a BCMS based on ISO 22301 to handle such disruptions.

The company formed a project team of four members from various departments and appointed Danielle as the project manager. Danielle conducted a comprehensive business impact analysis (BIA) focusing on activities related to data loss and backup recovery, recognizing the critical importance of safeguarding digital assets. She set specific recovery objectives, including a one-day recovery point objective (RPO) and a two-day recovery time objective (RTO).

Based on the BIA outcomes, the team chose a business continuity strategy that involved relocating preconfigured trailers with essential hardware and connectivity to an alternate site. Considering Marketiser's vulnerability to hurricanes, the strategy allowed swift activation and relocation with minimal lead time. To validate their strategy, Danielle and the team conducted real-time recovery exercises, testing their ability to restore data and resume critical operations within the defined RTO.

Danielle and the implementation team conducted a business impact analysis (BIA) for all activities related to data loss and backup recovery. Is this acceptable?

Options:

A.

Yes, it allows better identification of the business continuity objectives such as RTO and RPO.

B.

No, the impact criticality cannot be evaluated if a BIA comprises several activities.

C.

Yes, a BIA covering a group of activities is acceptable to be performed.

Question 11

What benefit can an organization obtain from a BCMS, from a business perspective?

Options:

A.

Reducing direct and indirect costs of disruptions.

B.

Creating a competitive advantage.

C.

Providing confidence in the organization’s ability to succeed.

Question 12

Which system is primarily focused on managing documented information throughout its life cycle, including creation, storage, retrieval, and versioning?

Options:

A.

Content management system (CMS)

B.

Electronic document management system (EDMS)

C.

Records management application (RMA)

Question 13

Scenario:

Initar, an IT security service company in New Jersey, provides 24/7 cloud and IT infrastructure support to mid-sized companies. Recognizing the need for a robust business continuity strategy, Initar transitioned from informal business continuity planning to implementing a BCMS based on ISO 22301.

During the BCMS implementation, a major nonconformity was identified: the BIA report lacked a defined Maximum Tolerable Period of Disruption (MTPD), which is required by ISO 22301. The corrective action process began with the IT team conducting a root cause analysis using a cause-and-effect diagram. Based on the analysis, an action plan was drafted to update all BIAs and establish the MTPD. The plan was approved by the head of the IT department, who monitored its implementation, while the internal auditor reviewed the effectiveness of the corrective action.

According to Scenario 7, the internal auditor followed up on the corrective action and reviewed its effectiveness. Is this acceptable?

Options:

A.

Yes, based on ISO 22301, after implementing any actions needed, a review of the effectiveness of corrective actions should happen.

B.

No, based on ISO 22301, it is not the responsibility of the internal auditors to review the effectiveness of corrective actions.

C.

Yes, only if a review of the effectiveness of corrective actions is really necessary.

Question 14

Which of the following is a discussion-based exercise?

Options:

A.

Functional exercise

B.

Full-scale exercise

C.

Desktop

Question 15

Scenario:

Prebank is a multinational financial institution. Its services include banking and investing through banking centers, ATMs, and mobile banking platforms. With millions of clients, Prebank's database systems record vast amounts of data and transactions daily. Its main activities depend on the ability of its employees to access clients' data through its database system at any time.

Recently, Prebank's database system stopped working unexpectedly. Soon after, it was discovered that this disruption was caused by the maintenance work on the road outside the company's office building. During the road repair, the workers had unintentionally damaged a water pipe that leaked into Prebank's basement. This leakage affected the company's electrical infrastructure, resulting in a loss of power, which shut down equipment and computers in the server room. Consequently, employees were unable to access Prebank's database system.

After this incident, the employees immediately notified Prebank's IT team. Subsequently, the IT team informed both the maintenance company responsible for the roadworks and the insurance company. The company responsible for maintenance told Prebank's IT team that the maintenance team was not available for the day. Since Prebank did not have a plan for responding to similar disruptions, they had to stop working and go home. Thankfully, the maintenance team arrived at the scene on the next day and made all the necessary repairs, allowing Prebank to resume all its operations.

Following these events, Prebank decided to change its strategy and procedures to prioritize business continuity planning within the company. Its main focus was to address the root cause of disruptions to improve business continuity. As such, the top management decided to implement a Business Continuity Management System (BCMS) based on ISO 22301.

After setting the company's business continuity objectives, the company established a project team, including a project manager and four additional team members. The BCM team was responsible for managing the BCMS implementation process, whereas the top management was responsible for the effectiveness of the BCMS. Through analyzing potential risk scenarios, the team defined Prebank's business continuity strategy as well as the resources for supporting business continuity within the company. This enabled the team to predict the impact of disruptions caused by various incidents, such as power outages. Following these actions, the company established a business continuity plan to manage disruptions effectively without impacting the workflow.

The effective implementation of the BCMS helped Prebank not only minimize losses and ensure continuity in its services but also absorb and adapt to a changing environment.

What type of hazard caused Prebank's database system to stop working?

Options:

A.

Environmental hazard

B.

Human-caused hazard

C.

Accidents and technological hazard

Question 16

Scenario:

Marketiser, a marketing company in Florida specializing in branding, advertising, market research, and design services, primarily serves small and medium-sized enterprises. After a devastating hurricane caused severe flooding and rendered its office unusable, Marketiser decided to implement a BCMS based on ISO 22301 to handle such disruptions.

The company formed a project team of four members from various departments and appointed Danielle as the project manager. Danielle conducted a comprehensive business impact analysis (BIA) focusing on activities related to data loss and backup recovery, recognizing the critical importance of safeguarding digital assets. She set specific recovery objectives, including a one-day recovery point objective (RPO) and a two-day recovery time objective (RTO).

Based on the BIA outcomes, the team chose a business continuity strategy that involved relocating preconfigured trailers with essential hardware and connectivity to an alternate site. Considering Marketiser's vulnerability to hurricanes, the strategy allowed swift activation and relocation with minimal lead time. To validate their strategy, Danielle and the team conducted real-time recovery exercises, testing their ability to restore data and resume critical operations within the defined RTO.

Marketiser's business continuity process is illustrated in Scenario 5. Is this process compliant with ISO 22301?

Options:

A.

No, according to ISO 22301, business continuity plans and procedures must be based on the selected business continuity strategies and solutions.

B.

No, according to ISO 22301, business continuity plans and procedures are input to BIA and business continuity strategy.

C.

Yes, according to ISO 22301, business continuity strategy is selected based on the business continuity plans and procedures.

Question 17

Scenario:

Belle, a food and beverage processing company, is dedicated to crafting products that meet customers' needs while promoting healthier lifestyles. Central to its mission is a commitment to upholding the highest food safety standards and ensuring the consistent quality of their offerings. From the initial stages of preparation through processing, packaging, and transportation, Belle maintains rigorous control over every aspect of food production.

Recognizing the importance of resilience in potential disruptions, Belle adopted a business continuity management system (BCMS) based on ISO 22301. By implementing this system, Belle aimed not only to ensure uninterrupted product delivery but also to enhance its reputation, foster customer confidence, and gain a competitive edge. To oversee the BCMS implementation, Belle appointed a dedicated business continuity project team responsible for leading the BCMS implementation project. It also assigned a business continuity manager responsible and accountable for the BCMS overall.

Before initiating the BCMS implementation, the BCM team conducted a thorough analysis of the stakeholders involved. Using specialized tools, they categorized stakeholders according to their influence, expected level of involvement, and anticipated contribution throughout the implementation of the BCMS and related activities.

Throughout the BCMS implementation process, Belle’s top management emphasized the integration of business continuity principles into existing processes, aligning them with the organization's strategic objectives. They developed the business continuity objectives and the BCMS scope. To ensure widespread understanding and adoption of the BCMS among employees,the BCM team developed an instructional video explaining the business continuity policy. Recognizing the unfamiliarity of employees with business continuity terminology, the team subsequently devised a comprehensive training program aimed at enhancing staff competence in BCMS matters. This initiative not only educated employees about the policy but also underscored the benefits of improved business continuity performance.

The organization also established evaluation methods to assess the impact of competence trainings. It measured the staff engagement and retention levels, as well as performance against training objectives.

As Belle continued to innovate and expand its product and service offerings, the organization revisited its BCMS scope to remain aligned with evolving priorities. Recent additions to the scope included a new department and two new products aligning with its updated business continuity objectives to enhance the safety of raw materials and key ingredients.

In response to potential disruptive risks, Belle established clear protocols outlining specific actions to be taken, assigning responsibilities, and defining criteria for evaluating the effectiveness of these measures. By proactively addressing risks and fortifying its resilience, Belle aimed to uphold its dedication to delivering safe, top-quality products while also safeguarding the interests of its stakeholders.

Belle decided to modify its BCMS scope, which was established at the beginning of the BCMS implementation process. Is this acceptable?

Options:

A.

Yes, the scope may evolve, ensuring that the BCMS continually supports the organization’s continuity goals.

B.

Yes, BCMS scope must be updated every three months in order to fit the requirements of the relevant standards.

C.

No, BCMS scope is developed as part of the initial implementation project and as such it should not be modified.

Question 18

What is a disadvantage to appointing an employee of the organization as project manager for the implementation of the BCMS?

Options:

A.

Might require a trial-and-error approach.

B.

Might be seen as a threat by the employees.

C.

Might be limited to unforeseen circumstances.

Question 19

What is the purpose of an audit follow-up?

Options:

A.

To confirm the conformity and effectiveness of the management system.

B.

To evaluate the actions taken to correct the detected nonconformities during the audit.

C.

To review internal audit results and management review results.

Question 20

Scenario:

Teleconn, a UK-based telecommunications provider, initiated a BCMS based on ISO 22301 to ensure reliable and consistent services. To monitor the BCMS’s performance, the internal audit function was outsourced to a company specializing in auditing services. The outsourced internal auditor was given unrestricted access to employees and documented information necessary for an effective audit.

Based on Scenario 6, the top management planned to conduct management reviews every three months. Is this compliant with ISO 22301?

Options:

A.

Yes, ISO 22301 does not provide any specific requirements regarding the frequency of management reviews.

B.

Yes, ISO 22301 requires organizations to conduct management reviews every three months.

C.

No, ISO 22301 requires organizations to conduct management reviews every six months.

Question 21

Scenario:

Headquartered in Sri Lanka, Operons Inc. is a freight forwarding company that adopted a BCMS aligned with ISO 22301. Prior to the certification audit, Operons Inc. measured gaps between their BCMS and the standard's requirements to ensure compliance. The certification body was contracted to conduct the audit, and a biased auditor from a previous ISO 9001 audit was replaced upon request. During the audit, two minor nonconformities were identified, and the audit team issued a recommendation for certification.

Based on Scenario 8, considering that these are only minor nonconformities and the top management was quick to acknowledge the oversight, the audit team issued a recommendation for certification. Is this acceptable?

Options:

A.

No, a recommendation for certification conditional upon filing of corrective actions should have been issued.

B.

No, an unfavorable recommendation for certification should have been issued.

C.

Yes, a recommendation for certification should be issued even in cases of minor nonconformities.

Question 22

An organization has implemented controls to prevent the unauthorized disclosure of documented information required by the BCMS. Is this in compliance with ISO 22301?

Options:

A.

Yes, only if the documented information required by the BCMS is stored electronically.

B.

No, the protection of documented information against unauthorized disclosure is not required but it is a good practice to follow.

C.

Yes, documented information should be protected from loss of confidentiality.

Question 23

Scenario:

Teleconn, a UK-based telecommunications provider, initiated a BCMS based on ISO 22301 to ensure reliable and consistent services. To monitor the BCMS’s performance, the internal audit function was outsourced to a company specializing in auditing services. The outsourced internal auditor was given unrestricted access to employees and documented information necessary for an effective audit.

The top management granted the outsourced internal auditor unrestricted access to employees and documented information necessary to conduct an effective audit. Is this appropriate?

Options:

A.

Yes, internal auditors should have unrestricted access to executives, employees, and information.

B.

No, outsourced internal auditors cannot have unrestricted access to employees and documented information for confidential reasons.

C.

No, outsourced internal auditors can have unrestricted access only to employees but not to documented information.

Question 24

Scenario:

Fundon is a financial services company certified against ISO 22301. As part of their BCMS, the company has established an exercise program. Due to an unexpected situation, the exercise coordinator of Fundon decided to suspend the exercise, which was planned to be conducted next week.

Is this acceptable?

Options:

A.

Yes, the exercise coordinator may suspend or stop an exercise if an unexpected situation, such as a real incident, occurs.

B.

No, the decision of stopping or suspending an exercise should be made only by the top management of the organization.

C.

No, ISO 22301 requires organizations to always perform exercise programs if they were planned.

Page: 1 / 8