Identify the two true statements about Enterprise performance Management Architect.
You have the following design requirement: You need to track customer status For a sales planning application. Valid options for customer status include: Active, Inactive, Out of Business. Customer status can change on a month-by-month basis.
What is the best way to build Customer Status into the Planning application?
Product status is a data element you need to include in your Planning application. Each product will have a product status that can vary over time. You will use product status in calculations and will need to report sales by product status and across products in a cross tab format.
What is the best way to meet all of these requirements?
A planning end user opens a data form and sees a long list of entities in the drop-down list in the Page section. She would like to shorten this list and use the search functionality instead. How can she change the number of members needed on a form to initiate a page dropdown search?
Identify two times when a security refresh needs to be performed.
You need to build the Entity into your Classic Planning application. You can dynamically build the Entity dimension in the Planning application via: (Select all that apply)
Identify the three true statements about the CapEx Planning module.
You are designing a monthly projection Planning application. A starting point projection file is received with the current month data. Data forms, Business Rules, and Essbase data load rules, and reports should always focus on the current projection month.
What is most efficient way to design the components to reduce maintenance each month?
Identify the two true statements assuming you are working with a single application with multiple plan types.
A Planning Unit has a status of First Pass; what two user types can input data?