Oracle Manufacturing Cloud 2024 Implementation Professional Questions and Answers

Question 1

Your customer is a light assembly manufacturing company that doesn't require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

Which three steps must they perform and verify in the Work Definition area?

Options:

A.

Select a resource to be used in automatic work definition by enabling the Default attribute for automatic work definition.

B.

Ensure the predefined work definition name ORA_MAIN is active.

C.

Ensure the item is a standard item with a secondary item structure.

D.

Ensure there is only one default standard operation at any point in time.

E.

Select a standard operation to be used in automatic work definition by enabling the Default attribute for automatic work definition.

Question 2

Your client informs you that after running the "Process Item Structure Changes to Work Definitions" scheduled process, they received a workflow notification.

Which statement is NOT a workflow notification that you might get if automation is not performed?

Options:

A.

The replacement component has been assigned as an ad hoc Item to the same operation as the original component.

B.

The manufacturing plant Is enabled for ERES, the work definition changes are not expected to go through an approval process.

C.

The original component is not assigned to any work definition operation.

D.

The original component has been assigned to more than one work definition operation.

Question 3

You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.

Which setup task must you perform in the Manage Plant Parameters section to achieve this?

Options:

A.

Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.

B.

Set Default Transaction Mode to Work Definition.

C.

Set Default Transaction Mode to AIL

D.

Set Default Transaction Mode to Entered.

Question 4

Which three entities must you set up in Oracle Manufacturing Cloud to create a work definition for an item that will be manufactured in-house?

Options:

A.

Resources

B.

Operations

C.

Production line

D.

Operation items

E.

Manufacturing lead time

Question 5

Which three are Cost accounting methods'

Options:

A.

Perpetual Average Cost

B.

Layer Cost, also known as "LIFO"

C.

Frozen Standard Cost

D.

Actual Cost, also known as "FIFO"

E.

Periodic Actual Cost

Question 6

Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?

Options:

A.

You can generate the Extensible Work Order Traveler report only from the Review Dispatch List and Manage Supplier Operations pages.

B.

It is a critical document that travels with the physical material during production.

C.

The production operator can invoke It from the Manage Work Orders, Review Dispatch ust. and Manage Supplier Operations pages.

D.

Operators can invoke it by using the Generate Extensible Work Order Traveler Report task.

E.

You use Page Composer to display only the required actions.

Question 7

A Production Operator is executing a work order at your plant. After completing move transactions, they notice that they have performed some incorrect move operations, including incorrect scrap and reject transactions.

They must perform a reverse transaction to correct the errors. The operations are not count point-enabled and not auto-charged.

Which four transactions are required to correct this situation?

Options:

A.

Reverse material issued to a work order.

B.

Reverse at an operation.

C.

Reverse from Scrap to Ready.

D.

Reverse from Reject to Ready.

E.

Reverse the product at the last operation.

F.

Reverse resources charged to a work order.

Question 8

Which three actions can a supervisor perform to annul or correct mistakes in a completed work order, committed by a user while entering work order details?

Options:

A.

Reverse a Closed order to Open.

B.

Correct the Product entered at work order.

C.

Reverse from Scrap to Ready.

D.

Reverse at an operation.

E.

Reverse the product at the last operation.

Question 9

A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particularday.

Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?

Options:

A.

Click Inside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource dropdown list > Enter 4 in Default Units Available.

B.

Click inside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration Fields > Go to the Resource Availability region > Populate A units in the Default Availability column.

C.

Click outside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration fields > Go to the Resource Availability and Overrides region > Populate 4 units in the Availability Override column.

D.

Click outside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource drop-

Question 10

Which three requirements are fulfilled by nonstandard work orders?

Options:

A.

Rescheduling

B.

Repair

C.

Rework

D.

Prototype

Question 11

During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.

What must they do to achieve this?

Options:

A.

Exclude cost variances while closing last month's work orders because those can be applied directly In Subledger Accounting.

B.

Make sure that all costs are Included while closing last month's work orders; however, variances can be Included after closing the work orders.

C.

Include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected must not be closed.

D.

Update work order costs at any time; they can be updated regardless of the status of the workorder

Question 12

Which three statements are true about executing rework work orders with manual control?

Options:

A.

You can perform operation completion only after the assembly has been issued to the work order, and only up to the quantity that the assembly component item Is issued to the work order.

B.

You can cancel the work order after releasing it and after performing any transactions.

C.

You must manually issue the assembly item to rework a work order, either partial or full quantity.

D.

You cannot cancel the work order after releasing it or after performing any transactions.

E.

If the group has grouping attributes, only work orders that match the grouping attribute values can be assigned to the groups.

Question 13

Which three types of item quantities are displayed on the Work Order History tab?

Options:

A.

In Process

B.

Scrapped

C.

Completed

D.

Remaining

E.

Total

Question 14

An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.

Which seeded job role must you assign to this employee?

Options:

A.

Manufacturing Engineer

B.

Production Engineer

C.

Manufacturing Supervisor

D.

Production Operator

E.

Production Supervisor

Question 15

In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?

Options:

A.

Supply Chain Orchestration initiates the creation of a purchase order without the work order.

B.

Expenditure Item Date Is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant.

C.

Expenditure Item Date is set to the receipt date and Expenditure Organization is set to the manufacturing plant.

D.

Supply Chain Orchestration initiates the creation of a requisition with the project details.

E.

Expenditure Type is sat to the expenditure type associated to the outside processing Item.