Oracle 1z0-1066-24 Oracle Planning and Collaboration Cloud 2024 Implementation Professional Exam Practice Test

Page: 1 / 13
Total 134 questions

Oracle Planning and Collaboration Cloud 2024 Implementation Professional Questions and Answers

Question 1

Which statement is NOT true about item attributes?

Options:

A.

The "forecast control" item attribute must be assigned if configure-to-order (CTO) items are being planned.

B.

Many item attributes can be overridden as part of a simulation set that gets applied to a plan.

C.

Some item attributes can be overridden directly in the Items table for simulation purposes.

D.

Supply plans ignore items with the "planning method" attribute set to MPP.

Question 2

You want to check how many items have excess inventory. Which three choices will get you there? (Choose three.)

Options:

A.

Open Table, Graph, or Tile Set > Table: Item Exceptions Summary > Filter by Items with Excess Inventory

B.

Manage Plans > Edit Plan Options > Select Supply tab > Navigate to Item area > Filter by Items with Excess Inventory

C.

Open Table, Graph, or Tile Set > Table: Exceptions > Expand Supply Planning Exceptions > Select Items with Excess Inventory

D.

Open Table, Graph, or Tile Set > Table: Items with Exceptions > Filter by Items with Excess Inventory

E.

Open Table, Graph, Tile Set > Table: Items > Select any Item > Drill to: Item Exceptions > Expand Supply Planning Exceptions > Select Items with Excess Inventory > Refresh the search results

Question 3

Which statement is true about the Production Scheduling Gantt chart?

Options:

A.

The Gantt chart is read only, but you can change colors, sizing, and perform filtering.

B.

You can view a Gantt chart or the Dispatch List, but not both at the same time.

C.

The Gantt chart identifies idle time, changeovers, and downtime.

D.

Metrics displayed above the Gantt chart include Late Demands, Late Work Order, Early Work Orders, and Changeover Time.

Question 4

Which three statements are true regarding Managing Units of Measure? (Choose three.)

Options:

A.

A unit of measure conversion is a mathematical relationship between two different units of measure.

B.

You must define a unit of measure class with a base unit of measure.

C.

Non-standard, intraclass conversion rates can't be item specific.

D.

A unit of measure standard conversion specifies the conversion factor by which the unit of measure is equivalent to the unit of measure class.

E.

If you want to transact items in units of measure that belong to classes other than their primary UOM class, you must also define conversions between the base units of measure of the different UOM classes.

Question 5

Which statement order is NOT true about how to effectively address demand at risk?

Options:

A.

Recommendations appear in one of these five categories (or tabs): Expedite Buy Orders. Expedite Planned Orders. Expedite Transfer Orders. Add Resource Availability, and Add Supplier Capacity.

B.

When you accept an expedite recommendation, the order is firmed by using the expedite date as the firm date. So when the plan is run after accepting the recommendation, the planning process assumes the supply is available on the firm date.

C.

Be aware that recommendations to expedite buy orders not only include purchase orders and requisitions, but also planned buy orders.

D.

To maximize effort, use the Recommendations Summary graph and aim for a low number of recommendations with the associated at-risk demand value substantial enough to make a difference in demand fulfillment percentage.

Question 6

You want to understand what your inventory turns are for your organization. Where can you see this information in Planning Central?

Options:

A.

Manage Planning Analytics

B.

Manage Planning Measures

C.

View Planning Analytics

D.

Manage Metrics

E.

Plan Summary

Question 7

Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.

How should they set this up for the easiest maintenance, going forward?

Options:

A.

Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.

B.

Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.

C.

Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.

D.

Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.

E.

Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.

Question 8

Which two statements are true regarding Planning Business Flows? (Choose two.)

Options:

A.

Inventory Planning cannot run in the Planning Business Flows.

B.

You can analyze and adjust data at any stage of the process.

C.

In automated plans, all release rules must be automatic.

D.

Demand and Supply Planning have to be run in separate business flows.

E.

Planners can set up automatic release rules or release orders manually as part of the plan execution.

Question 9

Your customer wants to display a numeric measure in both pound and kilogram Units of Measure (UOM) on a table. Describe the configuration steps to display a measure in two UOMs.

Options:

A.

Open a table and select Actions, View Table Configuration and click UOM tab. Select primary UOM as pound and secondary UOM as kilogram.

B.

Open a table and select View, Format Measures to find the measure. Now select pound as primary UOM and kilogram as secondary UOM.

C.

Open a table and select Actions, View Table Configuration and click Measure tab. Find the measure, duplicate the measure, and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.

D.

Open a table and select View, Format Measures to find the measure. Duplicate the measure and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.

Question 10

Which option outlines changes you can make to a simulation plan when evaluating demand and supply?

Options:

A.

Change item specification values, change item lead times, create mass changes for items

B.

Add demands, cancel demands, reschedule demands, add supply, cancel supply, reschedule supplies

C.

Change item specification values, change item lead times, change item-organization specification values

D.

Add demands, cancel demands, reschedule demands, add new planned orders, reschedule supplies

E.

Change item specification values, change item lead times, create mass changes for items all at once, change item-organization specification values

Question 11

During the FIFO pegging process, what is the correct order in which the supplies are sorted?

Options:

A.

Peg demands with reservations first and then peg demands that do not have reservations

B.

Pegging process sorts demands by due dates followed by reservation status

C.

Peg unreserved demands first and then demands with reservations

D.

Pegging process does not respect reservation, and demands are sorted based on demand and supply types

E.

Pegging process does not respect reservation, and demands are sorted based on due dates

Question 12

How does the Demand Fulfillment view prioritize at-risk demands?

Options:

A.

Based on the order value per customer weighted by the number of associated recommendations required to make the demand no longer at risk

B.

Based on order value weighted by the number of compression days required to make the demand no longer at risk

C.

Based on order value weighted by the number of associated recommendations required to make the demand no longer at risk

D.

Based on the number of associated recommendations required to make the demand no longer at risk

Question 13

Which statement is correct regarding S&OP?

Options:

A.

S&OP supply requirements are based on Bills of Resources (BOR) if available; otherwise, the Work Definitions are used.

B.

Sourcing cannot be maintained directly in S&OP, but must be collected.

C.

S&OP supply requirements are only based on Bills of Resources (BOR).

D.

If Bills of Resources are used, the only way to make one available is via import using a dedicated template.

Question 14

The marketing department of a company needs to analyze the forecast based on type of demand (large retailer versus specialty store) and item cost (low versus high).

After creating a segment group with demand class and product for segment granularity, what additional sequence of actions must they also perform to satisfy marketing?

Options:

A.

Define four segments based on demand type and item cost, define each segment's criteria, execute segmentation, and use the selector tool to create a new table or graph.

B.

Define four segmentation based on demand type and item cost, define each segment's criteria, execute segmentation, configure planning analytics to update the dimension catalog, and use the selector tool to create a new table or graph.

C.

Define four segments based on demand type and item cost, execute segmentation, and use the selector tool to create a new table or graph.

D.

Define two segments based on demand type and item cost, execute segmentation, and use the selector tool to create a new table or graph.

Question 15

When duplicating a supply plan, which parameters can you modify if Copy Type is “copy plan options only”?

Options:

A.

Name, Access. Owner, and Notes

B.

Name, Description. Access (but if the original plan was private, you can't edit the Users list), and Notes

C.

Name, Description. Access. Supply Planning Mode, and Owner

D.

Name, Description. Access. Owner. Include Archive, and Notes

Question 16

Which statement is correct regarding S&OP plan options?

Options:

A.

Calculating Safety Stock can optionally be included.

B.

Forecasting profile's input demand measure can only be set to 'consensus forecast' or 'approved consensus forecast'.

C.

Supply Planning Mode 'aggregated' can be turned off.

D.

Lead time compression can optionally be included as a legitimate plan constraint.

Question 17

Which two statements are true about Production Scheduling? (Choose two.)

Options:

A.

Schedule options include: Configure Scope. Parameters, and View Settings.

B.

Releasing a schedule can update Manufacturing Cloud work orders with revised dates, resources, release status, and work definitions.

C.

Refreshing a Production Schedule means that the schedule is being recalculated.

D.

A resource's constraint mode has two choices: Relaxed and Constrained.

E.

If a work order is not firm. Production Scheduling may schedule with an alternate resource.

Question 18

Which three statements are true about accounting?

Options:

A.

Landed Cost Management gives organizations visibility into their extended supply chain costs.

B.

Supply Chain Orchestration automatically selects the correct process based on user-defined subledger accounting rules when a supply creation is initiated.

C.

Receipt Accounting performs accrual accounting.

D.

Cost method can be assigned at the item level.

Question 19

You are in Implementation project and your customer is a global company with a complex supply chain network. Planners work across different geographies and different line of products. Each planner works with their own set of data and analysis and dashboards.

How do you configure the application so each planner can have their own custom dashboard view-able only to themselves?

Options:

A.

Create public page layouts that are tailored to specific business needs.

B.

You cannot create custom dashboards by user.

C.

Enable layout security checkbox in the Administer Planning Security.

D.

Create private page layouts that are tailored to specific business needs.

Question 20

As part of the agreement with one of your suppliers, you must always order product by the 100s. For example, if the required supply is 105, you must order 200, if it's 275, you must order 300. Which item attributes will help you achieve this?

Options:

A.

Minimum Order Quantity

B.

Fixed Lot Size Multiplier

C.

Maximum Order Quantity

D.

Fixed Order Quantity

E.

Rounding

Question 21

Planners are complaining about getting too many exception messages, some of which have minima value for evaluating plan health.

Which three solutions could reduce message clutter? (Choose three.)

Options:

A.

Go to Configure Exceptions, and specify a threshold for various messages.

B.

Go to Configure Exception Sets, and for the currently used exception set. specify a threshold for various messages.

C.

Go to Configure Exception Sets, duplicate the currently used exception set, remove the undesired messages from the duplicate set. then assign the duplicate set to all plans.

D.

Go to Configure Exception Sets, create a new set with only the messages the planners care about, and then, set all supply plans to use this new exception set.

Question 22

Which type of data in the Supply Network Model is not collected, but is accessed through a view used by Planning?

Options:

A.

Supplier data

B.

Customer data

C.

Organization data

D.

Carrier data

Question 23

Segmentation was last run many months ago and the replenishment planner is concerned about losing track of items whose policies get changed due to the upcoming resegmentation. There are also a lot of manually assigned segments that must be preserved. Which two approaches for Execute Segmentation should you use in this planner?

Options:

A.

Save the last segmentation result should be selected.

B.

No other setting is needed.

C.

Auto-approve segmentation changes should not be selected.

D.

Retain segment overrides should be selected.

Question 24

Your client manufactures consumer electronics and has all facilities live on Oracle Cloud. Their latest product has a very complicated manufacturing process and therefore can only be made at one facility (Organization ABC). However, it is ordered all over the world.

How should the Sourcing Rule be set up to accomplish this?

Options:

A.

A global sourcing rule for 50% make at ABC and 50% buy from ABC

B.

A local sourcing rule for 100% make at ABC; a global sourcing rule for 100% transfer from ABC

C.

A local sourcing rule for 100% make at ABC; a global sourcing rule for 100% buy from ABC

D.

A local sourcing rule for 100% buy from ABC; a global sourcing rule for 100% transfer from ABC

E.

A global sourcing rule for 100% make at ABC; a local sourcing rule for 100% transfer from ABC

Question 25

Which list of parameters is available for selection when you run the Start Backlog Planning scheduled process?

Options:

A.

Priority Rule. Organization. Demand Class, Item. Customer

B.

Demand Priority Rule. Organization. Demand Class. Item. Customer

C.

Backlog Priority Rule. Organization. Category. Item. Customer

D.

Demand Priority Rule. Organization. Category. Item, Customer

Question 26

Which is NOT a legitimate way to launch a plan?

Options:

A.

When editing plan options, click Save and Run.

B.

From Setup & Maintenance, in the Planning functional area, select a plan and click the Run icon.

C.

Launch via a scheduled process.

D.

From Manage Plans, select a plan in the search results, and select Run Plan from the Actions menu.

Question 27

You analyzed your customer's shipment history data at item and organization level. You found that the customer has many new products with limited history.

Does Planning Central support forecasting products with limited history, and what is this process called?

Options:

A.

No, Planning Central does not support the Croston Method for Sparse Demand forecasting method.

B.

Yes, Planning Central supports the Regression for Sparse Demand forecasting method, typically used for new products.

C.

Yes, Planning Central supports the Holt Exponential Smoothing forecasting method used for newly introduced products.

D.

No, Planning Central does not support the Regression for Sparse Demand forecasting method.

E.

No, Planning Central does not support the Holt Exponential Smoothing forecasting method.

Question 28

You are viewing a drop shipment plan for your organization and you want to know which customer the purchase order will be shipped to. Where can you see that?

Options:

A.

You need to first drill down to the sales order from the supply-demand link, then open the sales order to get the customer.

B.

It is visible in the drop ship analytics.

C.

It is not viewable at this time.

D.

You can see the customer on the supply in Supplies and Demand.

E.

You can see the supplier on the sales order, but not vice-versa.

Question 29

You ran a demand plan and you are reviewing the shipments forecast value measure. It is always zero for a particular item. Identify the root cause of this problem.

Options:

A.

In planning measures catalog, shipment forecast value measure is not enabled at item and organization level.

B.

In plan parameters, Item List Price marked as primary does not have price defined for the particular item.

C.

In plan parameters, shipment forecast value measure expression is not defined.

D.

In planning measures catalog, shipment forecast measure is not enabled at item and organization level.

Question 30

Which calendar is supported in the supply planning process but does not support bucketing by week?

Options:

A.

Lunisolar

B.

Fiscal

C.

Roman

D.

Gregorian

E.

Julian

Question 31

Which feature is NOT available for Sales and Operations Planning plans?

Options:

A.

View Segmentation Summary

B.

Configure Exceptions

C.

Collect Planning Data

D.

Load Planning Data from Files

Question 32

Your Procurement Department is getting ready to set up Approved Supplier Lists that will be needed for Supply Planning. They ask you for what you need on the ASLs for planning usage. Which three options are key for planning? (Choose three.)

Options:

A.

Make sure to include Maximum Order Quantities.

B.

Make sure to include Minimum Order Quantities.

C.

Make sure to include Fixed Lot Multipliers.

D.

Make sure to include Fixed Order Quantities.

E.

Make sure they are at a Global level.

F.

Make sure all Local level ASLs include an Organization.

Question 33

Which statement applies only to the planning of back-to-back items and not standard items?

Options:

A.

Planning analyzes supply shortages and capacity overloads using any of the standard planning tools.

B.

Must use Global Order Promising and Supply Chain Orchestration to release and create new supplies

C.

Must have added sourcing rules to the Global Order Promising assignment set.

D.

Planning pegs reserved supplies to sales orders.

E.

Planning collects bookings or shipments history to forecast items.

Question 34

Your client wants to create a supply plan that only considers sales order and disregards forecast demand within a specific demand horizon. What must you do to accomplish this?

Options:

A.

Manage Plans > Search and select supply plan > Supply tab > Organizations and Schedules tab > Remove all demand schedules

B.

Manage Plans > Search and select demand plan > Demand tab > General tab > Select 'Do no spread forecast'

C.

Manage Plans > Search and select demand plan > Demand tab > General tab > Check Demand Time Fence Control

D.

Manage Plans > Search and select supply plan > Supply tab > General tab > Advanced Options > Check 'Create time fence'

E.

Manage Plans > Search and select supply plan > Supply tab > General tab > Check Demand Time Fence Control

Question 35

You are a demand planner and you want to generate forecast for all laptop and desktop products in the US business unit. You are using standard enterprise and product hierarchy. You have created a demand plan and now you must define plan scope.

Identify three valid steps. (Choose three.)

Options:

A.

For plan parameters, select forecasting calendar as Gregorian and time level as week.

B.

For forecasting items, select hierarchy as product, level as category level 1, and laptop and desktop categories as level members.

C.

For plan parameters, select forecasting calendar as Gregorian and time level as month.

D.

For plan organizations, select hierarchy as enterprise, level as country, and US as level member.

E.

For forecasting items, select hierarchy as product, level as product, and all laptop and desktop products as level members.

F.

For plan organizations, select hierarchy as enterprise, level as business unit, and US and level member.

Question 36

The supply plan is not very reliable. Components often arrive early or late. A team of planners, buyers, marketers, product engineers, and materials managers are tasked to investigate. They list several possibilities that could explain their plan’s poor results.

If you were a member of the investigation team, which step would you recommend to help troubleshoot this serious issue?

Options:

A.

For inaccurate quantity-on-hand issues, use the Planning Advisor to identify inventory accuracy improvement opportunities.

B.

For incomplete or unreliable demand schedules, use the Planning Advisor to identify forecast accuracy issues.

C.

For incorrect or incomplete bills of materials, use the Planning Advisor to identify bill of material anomalies.

D.

For incorrect or unreliable supplier lead times, use the Planning Advisor to determine lead time accuracy.

Question 37

Which statement fully describes the contents and purpose of the Product Lifecycle Management (PLM) page layout?

Options:

A.

The PLM layout has one table to define and manage discontinuation dates, and another table for entering forecast percent changes.

B.

The PLM layout has one table to define and manage launch and discontinuation dates, and another for entering forecast adjustments.

C.

The PLM layout has two tables: one to define and manage launch dates for new products, and another for entering forecast adjustments.

D.

The PLM layout has a single table to define and manage launch dates, and also enter any forecast adjustments.

Question 38

Which four types of supplies can be reserved to a sales order in the inventory? (Choose four.)

Options:

A.

Work orders

B.

On-hand inventory

C.

Purchase requisitions

D.

Purchase orders

E.

Transfer orders

F.

Planned Orders

Question 39

You ran a demand plan with the data refresh option "Do not refresh with current data." Identify two true statements. (Choose two.)

Options:

A.

Shipments history data will not be modified.

B.

Forecasting engine will run without advancing the plan date.

C.

Shipments forecast data will not be modified.

D.

Forecasting engine will not run.

E.

Shipments history data will be updated.

Question 40

You have created several infotiles based on the client requirements. You now want to group them together for display. How do you accomplish this?

Options:

A.

First build them into an info set in Manage Infosets. Then open the info set on the plan by going to Open (choose area) > Choose info set.

B.

No need to group them. Open them directly on the plan going to Open (choose area) > Choose Infotile.

C.

First build them into a tile set in Manage Table, Graphs, and Analysis Sets. Then open the tile set on the plan by going to Open (choose area) > Choose tile set.

D.

First build them into a planning group in Manage Planning Groups. Then open the planning group on the plan by going to Open (choose area) > Choose planning group.

E.

First build them into a planning measure in Manage Planning Measures. Then open the planning measure on the plan by going to Open (choose area) > Choose planning measure.