Special Summer Sale Limited Time Flat 70% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 70spcl

ISTQB CT-PT ISTQB Certified Tester - Performance Testing Exam Practice Test

Page: 1 / 4
Total 40 questions

ISTQB Certified Tester - Performance Testing Questions and Answers

Question 1

Which of the following is a typical performance risk associated with mobile, browser-based, and embedded real-time architectures?

Options:

A.

Slow hard disk speed

B.

Misconfigured host machine

C.

Unexpected loads due to API accessibility

D.

Internet connectivity issues

Question 2

What is typically the result of oversaturation of system resources during performance testing?

Options:

A.

Response time will gradually improve over a period of time.

B.

Response time will be slow under significant load levels.

C.

Error logging will decrease.

D.

The size of the database will gradually decrease.

Question 3

Which of the following is the best description of spike testing?

Options:

A.

It focuses on the ability of the system to handle loads that are gradually increased to reach the expected maximum.

B.

It focuses on the ability of the system to handle loads that are at or beyond the expected peak load.

C.

It focuses on the ability of the system to meet future efficiency requirements.

D.

It focuses on the ability of the system to respond to quick and extreme changes in load.

Question 4

Which of the following is the most economical solution to minimize costs and time for performance testing for a high-end production client-server platform?

Options:

A.

Isolated lab environment

B.

Cloud-based environment

C.

Mainframe environment

D.

No environment

Question 5

What is the primary purpose of a load generator?

Options:

A.

Create a steady and consistent background load on the system

B.

Simulate user behavior in accordance with the defined operational profile

C.

Record and analyze the behavior of the system as it is executing the prescribed tests

D.

Support root cause analysis when performance degradation is encountered

Question 6

Which of the following is an advantage of using performance monitoring tools?

Options:

A.

They can prevent malicious behavior.

B.

They proactively compile metrics from server logs.

C.

They more easily identify and report multi-threading problems.

D.

They can proactively detect denial-of-service (DoS) attacks.

Question 7

When following the principal performance testing activities, when are resources allocated?

Options:

A.

During test planning

B.

During test execution

C.

During test evaluation

D.

During test completion

Question 8

You are managing a project that is testing a system that manages a newly redesigned jet engine for heavy aircraft. Given the fact that this engine is specifically engineered to reduce noise, it is important that the software maintains enough thrust for lift for a period of 5 minutes without exceeding 87.5dB. The software must achieve this independent of other internal systems such as fuel or navigation management.

Given the risk for the ability of the aircraft to meet the noise abatement regulations while still being able to fly, when is the optimum time in the software lifecycle to apply the performance testing?

Options:

A.

Preferably during each phase in the lifecycle

B.

Preferably at the end of system testing

C.

Preferably during system integration testing

D.

Preferably at the end of unit testing

Question 9

Which of the following is considered a common database protocol?

Options:

A.

ODBC

B.

JUNIT

C.

SMP

D.

MMS

Question 10

Which of the following is a typical performance risk associated with distributed architectures?

Options:

A.

A local hard disk that has been de-fragmented

B.

Excess computer memory resources

C.

Unreliable or unpredictable remote servers

D.

Inconsistent Bluetooth connectivity

Question 11

Which of the following is a major contributor to unreliable performance projections?

Options:

A.

Redundancy between the test and production environments

B.

Disagreement between the technical and business stakeholders during analysis

C.

Differences in the hardware between the test and production environments

D.

Business stakeholders setting unrealistic performance goals

Question 12

You have run a load test. When examining the metrics, you see that the virtual users experienced many timeouts and excessive wait times. The system throughput metrics exceeded expected results, even during peak times.

Based on your analysis, what conclusion should you draw?

Options:

A.

Network infrastructure should be investigated.

B.

Processing speed is too slow.

C.

Virtual users are exhibiting impatient behavior.

D.

New test data is needed.

Page: 1 / 4
Total 40 questions