Pre-Winter Sale- Special Discount Limited Time 65% Offer - Ends in 0d 00h 00m 00s - Coupon code: netdisc

ISM CORE Supply Management Core Exam Exam Practice Test

Page: 1 / 31
Total 312 questions

Supply Management Core Exam Questions and Answers

Question 1

Which of the following Is the BEST way to address a supplier's service performance and product quality during an annual business review?

Options:

A.

A report on actual spend in comparison with original projections

B.

A scorecard based on internal surveys

C.

An industry report on market conditions

D.

A site visit to verify supplier capabilities

Question 2

The use of procurement cards to simplify purchases of low cost/low complexity items is BEST suited for which of the following categories of spend?

Options:

A.

Leverage

B.

Tactical

C.

Critical

D.

Strategic

Question 3

An operations manager wants to replace the existing fleet of aging vehicles owned by the company. The operations manager presents the supply manager with a list denoting the quantity, makes and models currently in operation:

Quantity

Brand A - 4X4 SUVs15

Brand B - Midsize Cars5

Brand C - Compact Cars45

Which of the following is the BEST course of action for the supply manager to take?

Options:

A.

Request quotations for the listed quantities of vehicles, using generic specifications and performance requirements

B.

Request quotations for the listed makes and models of vehicles, with forecasted quantities to meet current and future needs

C.

Request quotations using generic specifications and performance requirements, with forecasted quantities to meet current and future needs

D.

Request quotations for the makes, models and quantities of vehicles specified on the list

Question 4

DEF Inc. receives several batches of inferior quality products from a supplier. Although all of the samples provided by this supplier met or exceeded specifications, it is learned that the facility used to produce the samples is in a different location than the regular production facility, and that the production environment could affect quality.

DEF could have prevented this situation by doing which of the following?

Options:

A.

Requesting and testing samples from all possible supplier manufacturing locations

B.

Requesting larger samples from the supplier prior to going into production

C.

Requiring the supplier to provide assurance that its products will meet the required specifications

D.

Placing stricter quality controls in the receiving dock to prevent defective products from being accepted into inventory

Question 5

XYZ, Inc. is negotiating with Supplier DEF for materials needed in manufacturing. The negotiations are moving slowly, primarily due to delays and postponements by the supplier. DEF has been the primary source for the material under negotiation, and while there are other potential sources, lead times would not make it feasible for XYZ to seek an alternative on such short notice. Which of the following tactics is DEF MOST likely employing?

Options:

A.

Missing person

B.

Red herring

C.

Power position

D.

False offer

Question 6

A manufacturing company has numerous sites around the country. Supply management teams at each location do not have the same understanding of the different Internal processes. Which of the following should senior supply management do in order to correct this problem?

Options:

A.

Establish, communicate and reinforce a supply chain map

B.

Contact suppliers to explain the processes and ask them not to collaborate with non-complying employees

C.

Contact supply managers at each site to implement disciplinary actions against buyers deviating from the process

D.

Centralize the purchasing activities at the firm's headquarters

Question 7

Which of the following is the PRIMARY reason for holding a business review with a supplier?

Options:

A.

To determine whether the supplier should be moved to the strategic engagement tier

B.

To strengthen the business relationship and to promote collaboration

C.

To ensure that senior executives from both companies meet on a recurring basis

D.

To review the supplier's cost performance relative to goals set for the year

Question 8

A supply manager for JKL, Inc., a high-tech services firm, is asked to expedite an order for training on new fire suppression equipment. The equipment Is due to arrive within the month and must be put into immediate use to comply with governmental regulations. A training company has already been found by JKL's human resources department and has committed to providing classes on a rush schedule. JKL has not done business with this training firm before, although they have received excellent evaluations from other clients.

In this situation, which of the following is the FIRST action the supply manager should take?

Options:

A.

Negotiate a master service agreement and SOW with the training company

B.

Review the training company's pricing

C.

Request an invoice from the training company

D.

Notify the training company that no contract exists because human resources did not have proper authority

Question 9

JKL, Inc. outsources its event services for large group training sessions and annual meetings. The contract requires the supplier to report program metrics, including cost savings. The savings method employed compares the hotel’s initial bid to the final negotiated price. The first report shows significant hard savings on the average nightly rate for hotel rooms. JKL's category manager would like to claim the hard savings. Which of the following BEST describes why the finance department should deny this request?

Options:

A.

Unless there is a year-over-year reduction, the savings is cost avoidance.

B.

Savings from outsourcing are subject to a higher level of governance.

C.

Further data is required from the supplier to sufficiently support the savings.

D.

Unless there is a year-over-year reduction, the savings is cost containment.

Question 10

A supply manager Is seeking potential suppliers to recreate a now obsolete custom component. The supply manager identifies five suppliers who have the technology to manufacture the part. The supply manager wants to understand the capability of these suppliers prior to bidding. Which of the following should the supply manager use in this instance?

Options:

A.

Collaborative optimization

B.

E-Design

C.

E-RFx

D.

E-Sourcing

Question 11

A supply manager is leading a negotiation team. This team will negotiate with several finalists supplying complex services. Prior to the negotiations, the supply manager briefs the team on strategies, roles and responsibilities. The team members seem to understand the importance of these factors, but shortly after the negotiations commence, several members begin to make mistakes such as arguing witF each other and failing to pay attention. Which of the following is the BEST course of action for the supply manager to take at this point?

Options:

A.

Call a caucus and reiterate the negotiation rules and their Importance In interactions with suppliers

B.

Remove the offending stakeholders from the negotiations, as they are not following the instructions

C.

End the negotiations and begin another round with different team members

D.

Contact the team members’ supervisors and express concern over the way they acted during the negotiations

Question 12

UVW, Inc. issues a Request for Quotation (RFQ) for urgently-needed safety equipment. The equipment must be installed immediately in order to keep the firm in compliance with safety regulations. UVW is contacted by a small, minority-owned company which asks for two more weeks to submit its quotation, as its technical expert is out sick. In this situation, which of the following is the MOST appropriate course of action for UVW to take?

Options:

A.

Extend the RFQ due date and notify all suppliers of the extension

B.

Accept other quotations as scheduled and set aside a portion of the award for the minority-owned supplier

C.

Inform the supplier that quotations must be received by the due date in order to be considered

D.

Return all quotations and issue a new RFQ

Question 13

A buyer finds an opportunity to reduce costs for a particular service through competitive bidding. The buyer issues a request for quotation (RFQ) to prequalified suppliers. However, the statement of work is incomplete, and not clear enough to get an accurate price for the service. Which of the following is the BEST course of action for the buyer to take in order to get a proper statement of work included in the RFQ?

Options:

A.

Gather information on the service and prepare a new statement of work

B.

Send an email to stakeholders asking them to review and update the current statement of work

C.

Contact the stakeholders and coordinate the improvement of the existing statement of work

D.

Send an email to stakeholders and request a new statement of work

Question 14

A company's accounting department implements a new system to track liabilities for capital assets. The reports developed by this system exclude some important indirect procurement data (e.g., transactions related to test equipment), as this information is tracked by another system. Which of the following is the BEST course of action for the firm to take in this situation?

Options:

A.

Estimate the total debts and assets being tracked outside the system and correct any large variances on a quarterly basis

B.

Notify senior management that reports from the new system may understate the company's debts and assets

C.

Notify the entire organization of the issue during the next iteration of the tool

D.

Take no action, as the aggregate numbers reported to shareholders will not be severely affected

Question 15

Which of the following is the BEST reason for inviting suppliers to visit a buying organization's facilities to meet with the company's stakeholders?

Options:

A.

To better position supply management's influence in the manufacturing process

B.

To gain a better understanding of suppliers' constraints

C.

To ensure the suppliers know which internal customers to contact at the buying organization

D.

To enhance the understanding between suppliers and internal customers

Question 16

A supplier's willingness to deal with rejected materials, fill surges in orders, and provide technical support will be MOST affected by which of the following?

Options:

A.

Creating teaming agreements with suppliers

B.

Negotiating Inclusive terms and conditions

C.

Maintaining good supplier relationships

D.

Including such conditions in the statement of work

Question 17

Which of the following refers to the process of generating information about the types of items sourced and their cumulative dollar value, to use for strategic and operational purchase planning?

Options:

A.

Cost analysis

B.

Regression analysis

C.

Spend analysis

D.

Portfolio analysis

Question 18

DEF, Inc. wants to ensure adequate material supply for an emerging product with high quality specifications for the raw materials. Given this situation, which of the following would be the BEST course of action for DEF to take?

Options:

A.

Select an approved supplier and work collaboratively with it to meet the entirety of the organization's quality requirements

B.

Ensure a wide selection of suppliers are offered opportunities to submit bids

C.

Choose a supplier with a large infrastructure and high quality standards

D.

Select a preferred supplier to cover the bulk of the requirement and supplement the balance with qualified suppliers

Question 19

Which of the following is the BEST course of action to take in order to develop a positive working relationship with a supplier?

Options:

A.

Invite engineering and production to meet with the supplier

B.

Work with the supplier one-on-one to develop a personal relationship

C.

Involve upper management in discussions with the supplier

D.

Involve Internal customers in team discussions with the supplier

Question 20

A supply manager Is conducting the following activities:

•Mapping between category codes and category maps

•Normalizing supplier information

•Performing supplier mapping

•Refining mapping with financial systems data

Which of the following is the supply manager engaged in?

Options:

A.

Risk analysis

B.

Spend analysis

C.

Market analysis

D.

Cost/price analysis

Question 21

As interest rates rise, what will MOST likely be the effect on supply?

Options:

A.

Suppliers will lock in raw material prices in anticipation of price increases.

B.

Suppliers will delay shipments by selling to other customers.

C.

Bond prices will rise, forcing suppliers to pay more for capital investments.

D.

The risk of supplier stock outs will increase due to higher costs of holding inventory.

Question 22

JKL, Inc. solicits bids for the repair of a boiler used in its shoe factory. Supplier A submits a bid of $7000. The next lowest bid is $8,000, and the remaining bids are between $10,000 and $11,000. JKL awards the contract to Supplier A. However, before beginning repairs, Supplier A realizes it made a mistake and underestimated the repair work. Supplier A refuses to do the work, saying it would lose money. If JKL declines to increase the payment and claims that Supplier A breached the contract, the MOST likely result would be which of the following?

Options:

A.

Supplier A will have breached the contract, but only if JKL did not know or have reason to know that Supplier A's low bid was the result of an error.

B.

Supplier A will not have breached the contract, because Supplier A can successfully argue that the contract is voidable.

C.

Supplier A will not have breached the contract because the frustration of purpose doctrine excuses Supplier A's non-performance.

D.

Supplier A will have breached the contract, but only if it is too late for JKL to accept the bid of the second lowest bidder.

Question 23

DEF, Inc. conducts a Request for Information (RFI) to identify suppliers who will be invited to participate in a Request for Proposal (RFP) for technical support. The RFI requires audited financial statements. DEF receives an inquiry from a publicly traded supplier asking if their 10K statement will suffice, and a privately held supplier states that it will only provide its audited financial statement after receiving a nondisclosure agreement from DEF.

Given this situation, which of the following is the BEST course of action for DEF to take?

Options:

A.

Issue a revision to the current RFI listing alternate methods and conditions acceptable in demonstrating financial health

B.

Maintain the requirement for audited financial statements so that all respondents are graded on the same basis

C.

State that DEF reserves the right to use information other than that received in response to the RFI to evaluate respondents' financial condition

D.

Negotiate with all respondents for more financial information

Question 24

A supply manager for an electronics distributor is asked to buy new routers for the company's wireless network. The supply manager is provided with a detailed scope of work and a list of potential bidders. However, the firm is also interested in investigating alternative solutions available on the market. The original equipment was purchased over 5 years ago and the budget is unknown, but it is roughly estimated at $250,000.

Given these circumstances, the MOST appropriate approach for the supply manager would be to issue which of the following?

Options:

A.

Request for quote

B.

Invitation to bid

C.

Request for proposal

D.

Request for information

Question 25

PQR Inc. sponsors numerous large events involving all of its divisions. PQR's supply manager proposes that the firm coordinate this spend to bring significant savings and simplify administration. However, PQR's top management believes that each division would prefer to deal with its own event planners. In this situation, which of the following is the BEST course of action for the supply manager to take?

Options:

A.

Invite leading suppliers to make presentations to management

B.

Assemble a team representing all divisions to discuss future meeting needs

C.

Gather updated information and re-introduce the proposal to top management

D.

Implement the proposed program on a trial basis and evaluate the results

Question 26

An organization selects a supplier for a complex system implementation that will be conducted in several stages. Prompt initiation of the project is necessary in order to maintain the schedule, but the stakeholders have not yet defined the later milestones and deliverables. Which of the following would be the MOST appropriate course of action for the buying organization to take regarding the statement of work (SOW) for this project?

Options:

A.

Create an initial SOW to allow the supplier to begin the first phase, with provisions for negotiating subsequent SOWs for full project implementation

B.

Provide a SOW with all requirements available thus far, and include procedures for internal customers to make changes via contract amendments

C.

Issue a general letter of intent so that the supplier can start mobilizing and avoid delays

D.

Postpone any type of agreement with the supplier until all requirements are fully defined

Question 27

A supply manager for UVW, Inc. Is considering the use of lead division buying. Which of the following factors is MOST supportive of such efforts?

Options:

A.

Each division needs products tailored to its own production.

B.

There is ongoing involvement of the engineering department.

C.

Several divisions use consistent quantities of the same item.

D.

Deliveries must be coordinated with production schedules.

Question 28

A foundation maintains ongoing relationships with agents in several remote locations. The agents are recruited to serve as instructors for the foundation's microbusiness development program. The foundation's supply manager learns that one of the agents has gone outside the defined area of responsibility by having repairs made to the local office after a storm. The agent explains that the building was unusable and potentially dangerous, and had to be repaired. The agent tried to contact the foundation headquarters to request approval for the repairs, but communications were down. Which of the following is the BEST course of action for the supply manager to take?

Options:

A.

Reprimand the agent in writing, and consider termination if the agent oversteps authority again

B.

Require the agent to bear the cost of all repairs made without approval

C.

Create a new reporting structure for satellite offices to mitigate communication problems

D.

Ratify the action and authorize payment for repairs made at the agent's direction

Question 29

A sourcing manager is negotiating a contract with a human resources supplier that has access to employee data, including social security numbers. The supplier proposes an annual cap of $10,000 on overall liability. In this situation, which of the following is the MOST important stakeholder for the sourcing manager to consult in regard to this supplier?

Options:

A.

Risk Management

B.

Operations

C.

Legal

D.

Information Technology (IT)

Question 30

A supply manager Is assigned to a new product similar to products the firm has developed in the past. Because the stakeholders have not defined all of the product's requirements, not all engineering diagrams have been completed, and the program is behind schedule. The program manager requests all procurement lead times for the project. Which of the following is the BEST way for supply manager to respond in this situation?

Options:

A.

Consult with suppliers for lead time estimates on similar parts used in related products

B.

Contract with the suppliers to start manufacturing the parts, as the engineering drawings are not necessary at this point

C.

Postpone any action until the engineering drawings are released

D.

Conduct regular meetings with the engineering team to expedite the release of the drawings

Question 31

Supplier X provides software critical to production at EFG Corporation. Supplier X informs EFG that the software version it currently uses will no longer be supported and recommends an upgrade to a newer version. However, EFG is very pleased with the performance of the current version, and the costs for upgrading are prohibitive at this time. EFG wants to find incentives for Supplier X to continue supporting EFG's needs. In this situation, which of the following would be the BEST course of action for EFG to take?

Options:

A.

Request Information on the newer software version to persuade top management of its value

B.

Contact EFG's legal department to review the liquidated damages clause in the contract with Supplier X

C.

Identify additional business opportunities for Supplier X at EFG, as part of their ongoing relationship

D.

Stress that failure to offer support will result in negative references for Supplier X

Question 32

When evaluating bids, the MOST critical aspect Is ensuring the quote meets the solicitation's

Options:

A.

quality requirements

B.

specifications

C.

technical capabilities

D.

terms and conditions

Question 33

A supplier's willingness to deal with rejected materials, fill surges in orders, and provide technical support will be MOST affected by which of the following?

Options:

A.

Creating teaming agreements with suppliers

B.

Negotiating Inclusive terms and conditions

C.

Maintaining good supplier relationships

D.

Including such conditions in the statement of work

Question 34

Which of the following refers to a stakeholder want as opposed to a stakeholder need?

Options:

A.

Requiring thata supplierprovidedelivery schedules that meet the requirements specified inthe contract

B.

Requiring thata supplierprovideaccommodations for the company's representatives duringvisits

C.

Requiring thata supplierprovidethe purchased component at or below the target cost

D.

Requiring thata supplierprovidedetailed specifications for review for the supplied item

Question 35

XI Corporation awards a contract for the building of a prototype critical to its introduction of a new product line. To protect itself against delays and unsatisfactory quality, which of the following is MOST appropriate for Xi's supply manager to require from the contractor?

Options:

A.

Performance bond

B.

Letter of credit

C.

Earnest money

D.

Payment bond

Question 36

An exploration firm's supply manager meets with the fleet operations team to plan for the acquisition of vehicles to be used in company operations on a remote Pacific island. As removing the old vehicles from the island has proven to be a significant problem, the team requests the inclusion of a "take-back" requirement in the contract. Which of the following is the BEST way for the supply manager to respond to this request?

Options:

A.

The supply manager should oppose the idea, as a take-back program from a remote island would be cost prohibitive.

B.

The supply manager should oppose the idea, as the sourcing process should be focused on acquisitions.

C.

The supply manager should refer the issue to the environmental quality manager.

D.

The supply manager should include this requirement in the firm's upcoming procurement.

Question 37

A bottleneck supplier consistently poses a risk of shutting down a company's production lines due to delivery issues. Which of the following is the BEST long-term solution to this problem?

Options:

A.

Conduct daily meetings with the supplier to manage its production schedule

B.

Pay expediting fees to get the parts from the supplier delivered sooner

C.

Impose financial penalties on the supplier each time the firm is negatively impacted by overdue parts

D.

Qualify more suppliers who can deliver the same product

Question 38

During its first annual business review, a supplier requests an increase in pricing. The supplier’s survey results show a rating of 2.9 out of 5 possible points (with 3.0 being acceptable). Market indices indicate that the supplier's industry has experienced no price increase. In this situation, which of the following is the BEST course of action for the buyer to take?

Options:

A.

Ask the supplier to respond to the survey results item by item, to determine the efficacy of the request

B.

Review the survey results with the supplier asking how it plans to address the concerns, and discuss the economic factors supporting the price increase

C.

Reestablish service level agreement expectations and deny any increase at this time

D.

Inform the supplier that the market indices do not support an increase, and issue a 30-day cure letter warning of contract breach based on the survey results

Question 39

A supply manager submits requests for additional personnel and equipment, which are approved. However, the organization's training budget is cut, giving less opportunity to train new employees. The supply manager is concerned that this will adversely affect the department's ability to build expertise. Given this situation, which of the following is the MOST effective action for the supply manager to take?

Options:

A.

Present justification showing how training supports cost reduction goals

B.

Utilize available training funds early in the year to gain maximum impact

C.

Fill fewer positions than approved and re-direct savings to training

D.

Seek highly-qualified applicants who will require less training

Question 40

A supply manager Is conducting negotiations with a supplier. The supplier states that it cannot offer a lower price because the product under negotiation is covered by a government contract. In this situation, the supply manager should

Options:

A.

offer to reduce the order quantity

B.

negotiate the other terms and conditions, and return to the issue of price at a later time

C.

conclude that this is in fact the best price that the supplier can legally offer

D.

require the supplier to provide specifics on the government contract restrictions

Question 41

XYZ Inc. is a chemical manufacturing company. XYZ requires high levels of consistency and precision from certain suppliers in their machining work. In order to drive continuous improvement with these suppliers, XYZ should develop KPIs to track performance in which of the following areas?

Options:

A.

Cost

B.

Quality

C.

Cycle Time

D.

Service

Question 42

A manufacturing firm has a product that has been experiencing shrinking profits. The product requires several high-tech parts with strict specification tolerances. The contract for these parts was recently renegotiated with favorable terms, including lower costs. The firm's supply manager has been asked to reduce the product's costs and improve margins. Given this situation, which of the following is the BES1 course of action that the supply manager can recommend?

Options:

A.

Conduct a quality function deployment (QFD) analysis

B.

Issue a request for information (RFI) to other suppliers

C.

Review the part requirements and design with engineering

D.

Renegotiate pricing with the current supplier

Question 43

Which of the following is MOST important to review before employing a low-cost country sourcing (LCCS) strategy in a remote region located in a distant geographical location?

Options:

A.

Litigation and arbitration laws

B.

Geo-political risks

C.

Access to basic infrastructure needs

D.

Unemployment and crime in the region

Question 44

A firm wants to leverage supply contracts by making maintenance, repair, and operations (MRO) supplies available to all of its subsidiaries. Which of the following is the MOST efficient and cost-effective way to provide product details to potential users?

Options:

A.

Require suppliers to provide secure ordering portals tailored to specific contracts

B.

Conduct train-the-trainer sessions for supply management staff at the subsidiaries

C.

Create internal online catalogs with ordering instructions and links to suppliers' sites

D.

Email a list of suppliers' websites to contacts at each subsidiary

Question 45

A supply manager is planning a major sourcing event and wants to increase competition, especially by small and minority-owned businesses. The supply manager strives to maintain fairness with all suppliers. Which of the following is the BEST way to encourage diverse suppliers to participate?

Options:

A.

Apply a percentage decrease on unit costs during evaluation

B.

Expand advertising of bidding opportunities

C.

Adjust delivery requirements

D.

Modify contract terms and conditions

Question 46

Which of the following refers to the legal principle that prevents a person from asserting a position Inconsistent with his or her prior conduct, if injustice would result to a person who has changed position in reliance upon that conduct?

Options:

A.

Conflict of interest

B.

Estoppel

C.

Severability

D.

Mutual consideration

Question 47

A supplier of software critical to PQR Inc.'s scheduling system plans to discontinue supporting the version PQR uses in order to concentrate its resources on a newer version. The current software works well for PQR, and upgrading It would be costly for them in both money and time. The supply manager for PQR assembles a negotiating team with representatives from user departments to discuss the situation with the supplier and try to reach a mutually satisfactory agreement.

Soon after the start of negotiations, the supplier states that 90 days is the longest they can guarantee support for the current software. PQR’s production manager responds by saying, "Fine, we will take any extension at this point." But PQR's IT director shouts, "We can't do that! It will take at least six months to replace the software, even if we could afford to do so."

Given this situation, which of the following is the BEST course of action for the supply manager to take?

Options:

A.

Ask the production manager and IT manager to calm down, and move on to another issue

B.

Ignore the outburst and continue with the negotiations as if it had not occurred

C.

Call a recess and meet with the team to recommit to agreed-upon roles and a unified strategy

D.

Use the outburst as an opportunity for all parties to address their concerns

Question 48

An oil & gas exploration company has employed its current offshore vessels for over ten years. The firm is seeking to bring its fleet up-to-date. The firm knows what results it requires, but with the changes that have occurred over the last decade, it is not sure what combination of vessel types and quantities will deliver the most efficient operations for its needs. Given this situation, which of the following will be MOST appropriate for this firm to issue?

Options:

A.

Request for proposal (RFP)

B.

Request for information (RFI)

C.

Request for quotation (RFQ)

D.

Invitation for bid (IFB)

Question 49

HIJ, Inc. is planning to purchase a generic, well specified item offered by many suppliers. This will be HIJ's first time purchasing an item of this type. The market is highly competitive, and HIJ has identified many pre-qualified suppliers. HIJ needs a standard weekly delivery of two full truckloads of the item to meet a fixed production schedule. In this situation, which of the following is likely to yield the BEST value for HIJ?

Options:

A.

Request for qualifications

B.

Invitation for bid

C.

Request for information

D.

Reverse auction

Question 50

A supply management office for a county government has been authorized to select a contractor to design, build and operate a new bridge. In the past, the county has experienced four major problems when hiring contractors:

1)Contractors dropping out of the bidding process due to lack of resources or ability to perform the scope of the work

2)A limited number of competitive bids that are able to achieve the value supply management desires

3)Underperformance of contractors after the award

4)The perception that the contractors are not operating effectively

In order to prevent these problems, which of the following should supply management do FIRST?

Options:

A.

Issue a Request for Information

B.

Issue an Invitation for Bid

C.

Issue a Request for Qualifications

D.

Conduct a pre-bid conference

Question 51

CBA Incorporated is an up-and-coming automobile manufacturer. CBA issues a request for proposal (RFP) for a supplier of a new radiator, to be designed by the supplier in accordance with specifications created by CBA. Two bidders are Interested: Supplier X, with whom CBA currently does business, and Supplier Y, who is new to CBA. The firm plans to make the chosen supplier a single source for all of CBA's radiators in return for collaborative design development and open book pricing, so that profit margins can be agreed to and set. The suppliers respond to the RFP, and Supplier X quotes a much higher price than Supplier Y. Given this situation, which of the following should CBA do?

Options:

A.

Conduct a should cost analysis for the radiator and offer the contract to the supplier that can meet the cost and the design specifications

B.

Contract with Supplier Y, as it is offering a lower price than Supplier X

C.

Engage Supplier X in negotiations with senior management about the merits of a win-win strategy and the opportunities that CBA is offering in terms of volume

D.

Inform Supplier X that the should cost price is the final offer, and terminate negotiations and source elsewhere if Supplier X refuses to accept the offer

Question 52

CDE, Inc. contracts with a supplier for the fabrication of trade show booths and displays. The contract is on a cost-plus fixed fee (CPFF) basis, with the supplier's agreed-upon fee set at $15,000

and the estimated allowable cost of materials set at $20,000, for a total of $35,000. The supplier is able to bring down total material costs to $18,500. Given this situation, how much can the

supplier bill CDE for the project?

Options:

A.

It will depend upon the profit margin allowed by the contract

B.

$35,000

C.

$33,500

D.

Up to $35,000, based on CDE's acceptance of components

Question 53

Which of the following is MOST appropriate for review by an audit committee?

Options:

A.

Paperwork needed to remain compliant with regulations

B.

Whether policy changes will optimize profits

C.

The existence of appropriate internal controls

D.

Forecasted sales and revenues

Question 54

A supply manager for PQR, Inc. is negotiating a contract to purchase software. The software will streamline PQR's online purchasing process with a one-click buy function. The supply manager wants to ensure PQR's performance expectations are met and that the consequences of failure to perform are properly captured. In this situation, which of the following is MOST important for the supply manager to include in the contract?

Options:

A.

Service-level agreements

B.

Protective covenants

C.

Warranties

D.

Maintenance and support

Question 55

A research company develops a tomato that grows in cold weather. The company agrees to sell ten thousand seeds to a broker for $5,000. However, an error is made on the contract which

misstates the price as $4,000. The research company and broker both sign the contract without noticing the error. Some weeks later, the broker discovers the error and refuses to pay more than

$4,000. In this situation, the FIRST course of action for the research company to resolve the dispute is to establish with the broker that

Options:

A.

there was a misunderstanding concerning price

B.

the written agreement constituted a partial integration

C.

the written agreement was a sham

D.

there was an administrative mistake

Question 56

A company has a large upcoming project. While the company has a current list of qualified suppliers capable of participating in this project, the chief procurement officer (CPO) wants supply management to conduct site visits with the suppliers under consideration. A senior supply manager is given the assignment of planning and scheduling the visits. Which of the following is the BEST way to begin this project?

Options:

A.

Select up to three suppliers to visit

B.

Establish the key evaluation criteria for the visits

C.

Submit a budget for the selection activity and site visits

D.

Select a cross-functional team to participate in the visits

Question 57

Which of the following is the GREATEST benefit of a supplier day/forum?

Options:

A.

Attendees can see how their products are used in the buying company's products.

B.

Attendees are given insight into new initiatives and strategic imperatives.

C.

Attendees have a chance to analyze and benchmark against the competition.

D.

Attendees can meet the customer's supply management team.

Question 58

Which of the following is the PRIMARY benefit of supply base rationalization?

Options:

A.

With fewer suppliers, the chances of purchase order errors are decreased.

B.

With fewer suppliers, fewer supply management personnel are required.

C.

With fewer suppliers, the chances of larger volume discounts are increased.

D.

With fewer suppliers, fewer quality issues are to be expected.

Question 59

A company purchases a high-value product In an industry known for slow turnover on receivables. This creates issues with cash flow and presents a special challenge to supply management. Given this situation, which of the following should this firm negotiate to BEST avoid difficulties in the buyer/supplier relationship?

Options:

A.

Extended NET terms

B.

Deposit payments on order and balance at shipment

C.

Cash discounts for early payment

D.

Cash in advance purchase

Question 60

ABC, Inc. has a supply management department responsible for placing orders. In spite of this, a designer from ABC's engineering department places an order with Supplier X for several products.

When the shipment arrives, it is rejected by the receiving department, as they cannot verify the order with supply management. To avoid this situation, the designer should have

Options:

A.

notified the supervisor of the engineering department of the immediate need for the item

B.

requested supply management issue an "after the fact" purchase order

C.

coordinated product needs with supply management prior to order commitment

D.

delayed placing the order until after looking at comparable items from other suppliers

Question 61

Which of the following is the MOST important benefit of implementing a contract management system?

Options:

A.

Greater visibility for reverse auctions

B.

Lower legal staff costs

C.

Access to a cooperative purchasing group

D.

Higher value-added activities

Question 62

A supply manager for XYZ, Inc. visits a manufacturer's plant and research division for a general inspection and product review. The supply manager is required to sign in at the registration desk and must acknowledge acceptance of the standard terms of visiting. After the visit, which includes very encouraging discussions, the supply manager returns to XYZ with a sample of a new product—an expensive item of complex design with innovative features. The supply manager must take specific precautions to protect the sample because

Options:

A.

the Truth-in-Lending Law requirements apply

B.

evaluation of the sample might consume company resources

C.

the plant sign-in may have established non-disclosure requirements

D.

damage to it may result in a charge for repair

Question 63

A supply manager for TUV, Inc. receives a call from an internal stakeholder complaining that for the past several months, one of TUV's longtime suppliers has been late with shipments, disrupting production. The Internal stakeholder has left several messages with the supplier, which have all gone unanswered. The supply manager listens to the stakeholder's concerns and states that these recent occurrences are atypical for this supplier. The supply manager offers to set up a call with the internal stakeholder and the supplier to discuss the situation and determine how the parties can move forward.

Which of the following BEST describes the supply manager's role in this situation?

Options:

A.

Negotiator

B.

Mediator

C.

Agent

D.

Advocate

Question 64

A university is evaluating its student registration software. The current system, purchased from Supplier A, has been in place for five years and works well, but may be outdated. A new system provided by Supplier B includes an online chat feature, which Supplier A's system currently does not have. While the costs for the two systems are essentially the same, Supplier B's system has an additional one-time implementation cost of $250,000. Supplier A informs the university It will provide its own online chat option for a one-time fee of $50,000.

The university calculates that switching to any new platform will involve migration costs. In this situation, the BEST course of action for the university is to

Options:

A.

negotiate with Supplier A to have the new platform implemented under $50,000

B.

continue with Supplier A, as the migration costs will be too high

C.

conduct an RFx stating new requirements, and add the migration costs to the evaluation criteria

D.

request Supplier A provide a single source justification, and implement the change by paying $50,000

Question 65

A local utility's supply manager is preparing a solicitation to select a contractor to construct a controlling station for the utility's main plant. Construction must begin within four months and be completed in a year or less, as delays in bringing the new station online could cause serious losses for the utility. Which of the following will be MOST effective in monitoring performance and ensuring timely completion?

Options:

A.

Specifying high consequential damages for failure to complete the project in a timely manner

B.

Ensuring that the scope of work is clear, to minimize misunderstandings

C.

Requiring milestones, progress reports, and liquidated damages for noncompliance

D.

Including a strong for-cause termination clause

Question 66

A manufacturing company experiences an increase in returns due to product quality issues. A root cause analysis determines that the raw materials are the cause, not the production process. In order to resolve this issue and avoid similar problems in the future, the firm should FIRST do which of the following?

Options:

A.

Require current suppliers to submit samples to determine if any materials do not meet standards

B.

Stop production and halt any shipments until the problem is rectified

C.

Find new suppliers for the raw materials

D.

Offer replacement products from current inventory so that customers can get new products right away

Question 67

An educational institution that delivers continuing education programs to business leaders has seen increased demand for its program in multiple languages. The supply manager responsible for the sourcing, contracting, and relationship development of these training providers has noticed its customers in other countries using local instructors who can better relate to the audiences. Which of the following supply base innovation skills is the supply manager facing?

Options:

A.

Managing differences

B.

Managing breakthroughs

C.

Managing transformation

D.

Managing decision-making

Question 68

The procurement officer for a publicly-traded U.S. company completes a 409 filing with the Securities and Exchange Commission (SEC), due to a number of supplier deliveries being missed that impact revenue forecasts. The procurement officer's NEXT step should be to

Options:

A.

review with the legal department what actions can be taken against suppliers with late deliveries

B.

document a corrective action plan

C.

determine what changes can be made to contracts to ensure suppliers meet delivery deadlines

D.

terminate contracts with suppliers who have been late with deliveries

Question 69

A U.S.-based supply manager wants to reduce the number of defective parts arriving from an outsourced supplier located in Malaysia. Which of the following is MOST likely to help achieve this goal?

Options:

A.

COPC 2000

B.

Six Sigma

C.

Sarbanes-Oxley

D.

Lean manufacturing

Question 70

A state university is looking to purchase equipment to scan books and manuscripts into a digital format. Several variations of this equipment exist in the marketplace, and the university has not decided which format is best for their needs. There is also a possibility that the cost for additional storage requirements will be shared with the state. Given this situation, which of the following is the FIRST course of action the university should take?

Options:

A.

Issue a Request for Information (RFI)

B.

Negotiate an agreement with the state government to share storage costs

C.

Issue a Request for Proposal (RFP)

D.

Conduct a joint suppliers' conference with the state government

Question 71

To better reflect commodity purchasing costs for its consumer automotive division, a firm separates inventory purchasing into "repairable parts" versus "consumable parts." This is an example of

Options:

A.

spend analysis

B.

market segmentation

C.

workload distribution

D.

category management

Question 72

A director of supply management is tasked with determining where savings can be found in indirect cost categories. If needed, the company will consider hiring additional staff to negotiate and administer contracts. Which of the following is the FIRST step the supply manager should take?

Options:

A.

Assess skills already available in supply management

B.

Identify a cross-functional team to brainstorm solutions

C.

Develop a new supplier relationship model

D.

Establish a baseline using current spend data

Question 73

During negotiations with a supply manager from FGH Inc., a supplier states that if FGH buys the 200 gigabyte version of its software package at a price of $700, the supplier will include a never-before-sold malware license valued at $147. FGH needs both the malware and the software package. If the supply manager agrees to the offer, FGH may claim a

Options:

A.

cost savings

B.

cost variance

C.

cost avoidance

D.

cost reduction

Question 74

Which of the following is a factor to be considered in a Total Cost of Ownership analysis for fleet automobiles?

Options:

A.

Disposal

B.

Regulations

C.

Income

D.

Indemnification

Question 75

A supply manager for FGH, Inc. places a purchase order for 10 widgets with a supplier. The supplier ships 10 widgets and invoices for 10 widgets, and the end user receives 10 widgets. However, the procure to pay system shows receipt of 8 widgets. The supplier demands to be paid the full amount. Responsibility for resolving this issue will fall to FGH's

Options:

A.

receiving department

B.

senior management

C.

accounts payable department

D.

supply manager

Question 76

Which of the following Is a strategic deliverable whereby proactive steps are identified in order to execute tactical-level actions within the sourcing process?

Options:

A.

Supplier forum

B.

Category management plan

C.

Benchmarking

D.

Business review

Question 77

A company that makes specialized equipment for a very competitive industry relies on several critical engineered imported components. The components present a high degree of risk that could impact the future growth of the company. Given this situation, which of the following is the BEST course of action for the buying organization to take when preparing for negotiations with suppliers?

Options:

A.

Ask suppliers to analyze potential sources of risk for all components and raw materials

B.

Change sources of any components or raw materials that are imported from high-risk countries

C.

Require suppliers to provide risk insurance, with the buying organization listed as contingency beneficiary

D.

Determine with senior management and internal stakeholders the acceptable levels of risk for each product

Question 78

When developing a category management plan, which of the following is the BEST reason for soliciting cross-functional input?

Options:

A.

It facilitates Input from stakeholders and other functional areas to ensure a long-term solution.

B.

It provides an opportunity to demonstrate non-linear leadership.

C.

It allows the category manager to gain important insights from the supply management team.

D.

It enables the category manager to resolve conflicting views and priorities for goods or services.

Question 79

A firm needs training services within a short time frame. The firm's supply manager issues a request for quotation (RFQ) to training companies, evaluates the offers received, selects the lowest bidder meeting all of the requirements, and prepares a contract. The selected bidder states to the supply manager that because of the scarcity of qualified trainers, the bidder needs to offer incentives, and therefore must raise its quoted rates. In this situation, what should the supply manager do FIRST?

Options:

A.

Negotiate with all offerors for reduced rates

B.

Renegotiate with the lowest bidder

C.

Remind the supplier its quoted rates are binding

D.

Revise the specifications and issue a new RFQ

Question 80

DEF, Inc. is a multinational oil company expanding into a new geographic region. The firm's policy is to purchase locally for its operations whenever possible. Thus, DEF needs to find sources of materials, basic equipment, and standard bulk items within the new region. Given this situation, which of the following is the BEST way for DEF to proceed?

Options:

A.

Hold a supplier conference followed by a Request for Information (RFI)

B.

Issue a Request for Information (RFI) followed by a Request for Quotation (RFQ)

C.

Issue a Request for Information (RFI) followed by a purchase order

D.

Hold a supplier conference followed by a Request for Quotation (RFQ)

Question 81

Which of the following is the MOST important reason for supply management to share company business plans with current and prospective suppliers?

Options:

A.

To set the stage for supplier concessions and discounts

B.

To remind suppliers how important supply management is to their success

C.

To show suppliers the benefits of investing time and resources into the relationship

D.

To prevent any problems or misunderstandings in the buyer/supplier relationship

Question 82

A supply manager wants to develop a strategy to facilitate supplier Innovation. Which of the following is MOST likely to achieve this goal?

Options:

A.

Locating new suppliers that lead their industry

B.

Recognizing current suppliers for innovative performance

C.

Leveraging innovations from one supplier to improve all other suppliers

D.

Awarding contracts only to the most innovative companies

Question 83

A buying firm learns that its sole supplier of a critical part is being sued by an employee for negligence. The firm is currently in negotiations with this supplier. To minimize or avoid risk, which of the following is the BEST tactic for the buying firm to utilize in this situation?

Options:

A.

Postpone the negotiations until after the suit is settled

B.

Request more favorable payment terms

C.

Complete the negotiations while monitoring the situation

D.

Purchase an all-risk insurance policy

Question 84

To improve supplier innovations, a firm plans to conduct supply market research, identify emerging technologies, and analyze the capabilities of current and potential suppliers. Which of the following would be the MOST effective way to accomplish this goal?

Options:

A.

Form a center of excellence

B.

Reorganize the research and development department

C.

Conduct business review meetings

D.

Redesign the firm’s supplier scorecards

Question 85

A supply manager solicits bids for janitorial services. The incumbent cost is $20,000 per month to perform Scope A. After working with internal stakeholders, obtaining bids, and performing negotiations, a new supplier is awarded the agreement. The new supplier's cost is $19,000 per month to perform Scope A as well as Scope B, which was previously performed by another supplier at a cost of $2,000 per month.

What is the annual cost reduction?

Options:

A.

$24,000

B.

$36,000

C.

$12,000

D.

$48,000

Question 86

A large manufacturing organization has a policy of awarding contracts to a single source based on bids for requirements over a specified time period. Some of the parts sourced are readily available from many suppliers, and the organization's supply management team recommends choosing a few of these parts for a trial project to determine the effectiveness of multiple sourcing. The MOST likely advantage of the multiple sourcing arrangement will be

Options:

A.

improved production scheduling accuracy

B.

the ability to test new suppliers with little risk

C.

enhanced standardization programs

D.

the improvement of product quality

Question 87

With which group of suppliers is It MOST important to conduct regular performance reviews?

Options:

A.

Standard

B.

Key

C.

Strategic

D.

Commodity

Question 88

In portfolio analysis, purchases for which the buying organization consolidates spend with a handful of suppliers but still maintains competition are BEST classified as

Options:

A.

bottleneck

B.

routine

C.

strategic

D.

leverage

Question 89

An international company is conducting its annual review of its supply management processes to confirm compliance to corporate legal requirements. An external audit team plans to visit each location. Which of the following is the MOST important activity each supply management professional should perform in order to prepare for the audit?

Options:

A.

Review the order, receipt, and payment process with the accounting department

B.

Review the ISM Principles and Standards of Ethical Supply Management Conduct

C.

Review company supply management policies with strategic suppliers

D.

Review supply management activities to verify adherence to policies and procedures

Question 90

Telling a seller during negotiations that "This is our best and final offer" is a(n)

Options:

A.

strategic move that can shorten an otherwise lengthy negotiation, which should only be used when strong benchmarking supports the offer

B.

risky negotiating tactic that should be used with caution, and only if the buyer has a suitable alternative

C.

effective tactic that typically yields an optimum result

D.

tactic that should be avoided regardless of the circumstances, due to its potential harm to the client-supplier relationship

Question 91

A manufacturing firm which prides itself on excellent customer service, quality, and prompt delivery decides to outsource several of its high volume, cost-driven products. The firm's supply manager is tasked with ensuring that service level expectations are maintained during the transition. Which of the following is the BEST step for the supply manager to take to ensure a smooth transition?

Options:

A.

Promote supply management staff as examples of change leaders

B.

Emphasize the focus on relationship management to support customers

C.

Direct staff to concentrate on execution and teamwork

D.

Redesign the department for better end-to-end supply management

Question 92

A firm is developing a solicitation to purchase materials in order to meet the needs of a new product launch. The firm anticipates that some or all of its existing suppliers will respond to the solicitation. Given this situation, which of the following is the BEST requirements gathering approach for the firm?

Options:

A.

Describe, define, document and build approach

B.

Joint requirements development sessions

C.

Repetitive requirements gathering and testing

D.

Pilot and redesign approach

Question 93

One of TUV Company's largest suppliers has been performing poorly, and the quality of its services does not meet the needs of a particular stakeholder. Which of the following is the BEST way for TUV's supply manager to evaluate how to establish service level agreements (SLAs) to improve the performance of this supplier?

Options:

A.

Request that the supplier provide a set of metrics to be used in measuring performance

B.

Develop measurements of supplier performance with the stakeholder, and include those measurements in an amendment to the contract

C.

Notify the supplier that its level of performance is not acceptable, and renegotiate contract pricing to reflect the supplier's performance

D.

Notify the supplier of the performance issues, and terminate the contract if the supplier does not correct performance within thirty days

Page: 1 / 31
Total 312 questions