Why is SNMPv2c considered to be insecure?
What is the correct cable type to use when connecting a server to a switch using 10 Gbps Short Range (SR) SFP+ optical connections?
Match the feature to the lowest iLO5 license in which it is available
A customer requires a management solution that will provide email notifications if hardware errors occur on their servers. Which management solution provides this functionality?
Match each ProLiant solution to its ideal use case
A customer purchased a Nimble HF20 a year ago They are experiencing an issue with a few of their VMware servers in the RTP Nimble date center and asked that you make a recommendation based on the data in infoSight.
What should you recommend'?
An administrator deployed a new FlexFabric switch Into the environment and wants to collect baseline information from the switch The administrator wants to be able to use this in case there is any question from support should the administrator open a case.
Which command can the administrator use to collect support information from the switch?
A customer needs to deploy an application on a newly-installed HPE ProLiant server, but they report that the server is not online. They call you for remote support. The IP address on the production network cannot be reached. You are evaluating the probable root causes of this issue.
According to the troubleshooting methodology, what are next two steps? (Select two)
A customer has a single HPE ProLiant Gen 10 server.
Which embedded management tool should they use to monitor the server?
What is used to identify a storage HBA port in a Fibre Channel SAN fabric?
A customer has a single ProLiant DL560 Gen 10 running a virtualization system. They want to validate installed firmware components at the hardware level.
Which built-in management tool should they use to complete this task?
A solution integrator is installing new data center components including an HPE G2 Advanced Rack with two Standard Series G2 PDUs A customer observing the installation process questions whether there will be sufficient power for additional equipment that may be added in the future.
How should the solution integrator respond?