Question 1

What command is used to gather data from Brocade switches?

Options:

A.

show all

B.

show tech-support details

C.

supportshow

Question 2

How many writes per day are SAS Flash 4 drives rated at?

Options:

A.

10

B.

3

C.

1

D.

5

Question 3

Which two options are input parameters for Unity Designer? (Select 2)

Options:

A.

NAS Server Nodes

B.

Enclosures

C.

Block and File resources

D.

Drive Modules

E.

Host Access Modes

Question 4

Which two parameters avoid bottlenecks and improve performance when sizing Dell Unity XT storage solutions? (Select 2)

Options:

A.

Network Bandwidth

B.

Port Utilization

C.

Port load balancing

D.

Network Latency

E.

Workload Types

Question 5

What benefit do higher capacity drives provide in a Dell Unity All Flash array?

Options:

A.

Larger I/O size

B.

Less physical space is used

C.

Efficient utilization of front end ports

Question 6

What are the default DRR values in the PowerStore sizing tool for block and file workloads?

Options:

A.

Block = 4:1 File = 4:1

B.

Block = 4:1 File = 2:1

C.

Block = 1:1 File = 1:1

D.

Block = 2:1 File = 2:1

Question 7

Which two options allow the collection of telemetry files when evaluating an existing Dell Unity XT system configuration? (Select 2)

Options:

A.

unity_service_data collects

B.

UEMCLI

C.

PSTCLI

D.

unity_telemetry_data collects

Question 8

Which tool delivers frequent, dynamic, nondisruptive content updates for a user?

Options:

A.

CloudIQ

B.

Environment Collection Tool

C.

My Work

D.

Live Optics

Question 9

What is the minimum number of drives in a RAID 5 dynamic pool?

Options:

A.

10

B.

6

C.

5

D.

9

Question 10

What can be done to provide best performance on Dell Unity iSCSI connections?

Options:

A.

Configure Jumbo frames end-to-end.

B.

Configure LACP on all connections.

C.

Utilize FSN on hosts.

D.

Configure Flow control on all ports.

Question 11

What is the maximum throughput per port in backend 12 GB SAS ports in Dell Unity XT arrays?

Options:

A.

2,000 Mbps

B.

2,500 Mbps

C.

25,000 Mbps

D.

250 Mbps

Question 12

What is done during the preconfigure step of a PowerStore block import migration?

Options:

A.

Source system is added to the PowerStore.

B.

Destination volume is created.

C.

Network connectivity is set up.

D.

Import schedule is set.

Question 13

A customer has a data center with applications running on 16 volumes that are presented from a Dell Unity XT system. They want to design a DR site within metro distance with zero RPO using storage-based replication. According to Dell best practices, which design approach minimizes the impact on storage performance?

Options:

A.

Use multiple ports per controller for replication.

B.

Include a Flash tier in a hybrid pool where synchronous replication is active.

C.

Use Thick volumes within the replication group.

D.

Create the synchronous replication session before filling the source storage object with data.

Question 14

A solution architect is sizing a new Dell Unity XT array that requires hybrid dynamic pools. Which option must be selected in Midrange Sizer?

Options:

A.

Advanced Performance

B.

Application Oriented

C.

Quick Configuration

D.

System Designer

Question 15

Which statement is true about dynamic node affinity?

Options:

A.

Maintains relatively consistent utilization, latency, and performance between both nodes.

B.

Automatically moves NAS servers to the peer node to balance the workload.

C.

Trespass affected block volumes between nodes.

Question 16

What initiates an automatic NAS server failover to the peer SP?

Options:

A.

Assisted internal migration

B.

Network link failure

C.

SP hardware fault

D.

Resource balancing algorithm

Question 17

What is the minimum RPO that can be configured on a Dell Unity XT block-asynchronous replication session?

Options:

A.

60 minutes

B.

1 minute

C.

5 minutes

D.

20 minutes

Question 18

Which two workload parameters are required to proceed with sizing for a PowerStore solution? (Select 2)

Options:

A.

Response time

B.

IOPS

C.

Effective Capacity

D.

Data reduction ratio

Question 19

A solution architect notices the PowerSizer is translating File Operations into IOPS for cluster and appliance summary details. IOPS are not impacting the summary MiB/s. What is the cause of this issue?

Options:

A.

File Operations was entered. MiB/s was entered.

B.

File Operations was entered. MiB/s was not entered.

C.

File Operations was not entered. MiB/s was not entered.

D.

File Operations was not entered. MiB/s was entered.

Question 20

Which two statements are correct for a PowerStore 5200T with mixed SSD and SCM drive combination? (Select 2)

Options:

A.

Expansion Enclosures are supported.

B.

NVMe drives are not used for Caching and Vaulting.

C.

SSD drives are used for metadata tiering.

D.

SCM drives do not add to usable capacity.

Question 21

What is the maximum supported drive configuration in the base enclosure of the PowerStore 3200T?

Options:

A.

23xNVMe SCMs 2 x NVMe NVRAM

B.

21 x NVMe SSDs 2 x NVMe NVRAM

C.

23 x NVMe SSDs 2 x NVMe NVRAM

D.

21 x NVMe SCMs 4 x NVMe NVRAM

Question 22

What is recommended maximum cable length for PowerStore back-end NVMe cabling to avoid performance issues?

Options:

A.

100 meters

B.

10 meters

C.

3 meters

D.

5 meters

Question 23

A customer has three Dell PowerStore 1000Ts in a cluster and wants to add a PowerStore 5000X. What must they do?

Options:

A.

Create a cluster with the 5000X.

B.

Use the PowerStore CLI to add the appliance.

C.

Reconfigure the existing cluster.

D.

Use the PowerStore Manager to add the appliance.

Question 24

An architect is designing a cost-effective PowerStore solution in sizer that is expected to perform in the event of a node failure without impacting the max performance. What must be considered?

Options:

A.

Set Max Performance Saturation to 50% while sizing.

B.

Plan and design a disaster recovery site.

C.

Set Performance Growth to 50% while sizing.

D.

Provide a higher model than the sizer-recommended solution.

Question 25

A company has a Dell Unity XT 880 at its Boston site providing file storage for a business production application. The company has a second remote site 8 km (5 mi) away in Cambridge. A third site is in New York (342 km (213 mi) from the Boston site). How can the same production data be protected against system outage with a zero RPO and a maximum of 15 minutes RPO data recovery?

Options:

A.

Synchronous replicate from Boston to Cambridge Asynchronous replicate from Boston to New York

B.

Synchronous replicate from Boston to Cambridge Synchronous replicate from Boston to New York

C.

Asynchronous replicate from Boston to Cambridge Asynchronous replicate from Cambridge to New York

D.

Synchronous replicate from Boston to Cambridge Synchronous replicate from Cambridge to New York