A work center has a balance between the scheduled input and output over the next 4 weeks. One of the three machines in the work center will be out of service for 1 week. Currently, three operators work the first shift, one operator works the second shift, and each has a 40-hour work week. Which of the following actions is best to take to maintain the schedule?
The primary reason for using an empty conveyance container as a triggering signal is to:
Which of the following basic layout principles should be applied to improve work flow?
The next job to be performed was selected because it had the least amount of operation time prior to the due date. Which of the following priority sequencing rules was being used?
Statistical process control is a technique primarily used to:
Which of the following applications is an effective use of electronic data interchange?
Which of the following methods is used to sequence jobs planned for production within the same time period?
Managing the constraint in an operation will improve which of the following metrics?
If an operation on a routing is performed out of sequence and the change in sequence is not reported to the formal system, which of the following situations will occur?
The following problems were reported from the field:
{exhibit 4967}
Which of the following techniques could be used to solve these problems?
Reducing design cycle time improves which of the following measures?
Which of the following performance metrics best measures customer satisfaction?
Capability index is useful to predict which of the following factors?
Which of the following components are associated with inventory functions?
Which of the following benefits is a result of Standardized Work?